다단계 베르누이 라인을 위한 성능 모델: 다품종 제품과 WIP 및 순환 정책
Performance Models of Multi-stage Bernoulli Lines: Multiple Types of Products with WIP and Cyclic Policy
1
조회
0
다운로드
0
인용
0
참고문헌
키워드
초록
As various types of products are produced in a single production system, it is important to determine a scheduling policy that selects one of the different types. In addition, the failure of processes in a line need to be considered due to machine failure, raw material supply and demand, quality issues, and worker absence, etc. Therefore, we studied production systems with various product types, dedicated buffers for each product type, Bernoulli equipment, and WIP-based scheduling or cyclic scheduling. To analyze such system exactly, we introduced a method to analyze the performance such as production rate, WIP level, blocking probability and starvation probability based on Markov chains and derived various characteristics. Especially, assuming that equip- ment does not need to select the type it just tried, the flow rate is no longer conserved and increasing buffer capacity does not guarantee increase production rate. The performance comparison between WIP-based and cyclic policy is studied as well.
Abstract
As various types of products are produced in a single production system, it is important to determine a scheduling policy that selects one of the different types. In addition, the failure of processes in a line need to be considered due to machine failure, raw material supply and demand, quality issues, and worker absence, etc. Therefore, we studied production systems with various product types, dedicated buffers for each product type, Bernoulli equipment, and WIP-based scheduling or cyclic scheduling. To analyze such system exactly, we introduced a method to analyze the performance such as production rate, WIP level, blocking probability and starvation probability based on Markov chains and derived various characteristics. Especially, assuming that equip- ment does not need to select the type it just tried, the flow rate is no longer conserved and increasing buffer capacity does not guarantee increase production rate. The performance comparison between WIP-based and cyclic policy is studied as well.
참고문헌 (23)
- Altiok, T., "Performance analysis of manufacturing systems" (1997), Springer Science & Business Media
- Arinez, J., "Quality", quantity improvement in an automotive paint shop : A case study, 2010, pp.7(4), 755~761
- Chiang, S. Y., "Improvability of assembly systems II : Improvability indicators and case study", Mathematical Problems in Engineering, 6(4), pp.359~393 (2000)
- Colledani, M., "Performance evaluation of linear and non-linear multiproduct multi-stage lines with unreliable machines and finite homogeneous buffers", IIE Transactions, 40(6), pp.612~626 (2008)
- Diamantidis, A., "Performance evaluation of flow lines with non-identical and unreliable parallel machines and finite buffers", International Journal of Production Research, 58(13), pp.3881~3904
- Feng, W., "Scheduling policies in multi-product manufacturing systems with sequencedependent setup times and finite buffer", International Journal Production Research, 50(24), pp.7479~7492 (2012)
- Feng, W., "The robustness of scheduling policies in multi-product manufacturing systems with sequence-dependent setup times and finite buffers", Computer & Industrial Engineering, 63(4), pp.1145~1153 (2012)
- Feng, Y., "Analysis of closed loop production Lines with Bernoulli reliability machines : Theory and application", IISE Transactions, 50(3), pp.143~160 (2018)
- Kuo, C. T., "Bottlenecks in serial production lines : A system-theoretic approach", Mathematical Problems in Engineering, 2(3), pp.233~276 (1996)
- Li, J., "Production Systems Engineering" (2008), Springer
- Li, J., "Customer demand satisfaction in production systems : A due-time performance approach", IEEE Transactions on Robotics and Automation, 17(4), pp.472~482 (2001)
- Lim, J. T., "Homogeneous, asymptotically reliable serial production lines: theory and a case study", IEEE Transactions on Automatic Control, 25(5), pp.524~534 (1990)
- Papadopoulos, H. T., "Queueing Theory in Manufacturing Systems Analysis and Design" (1993), Chapman & Hall
- Papadopoulos, H. T., "Throughput rate of multistation reliable production lines with inter station buffers(II)Erlang case", Computers in Industry, 13(4), pp.317~335 (1990)
- Park, K., "Flexible manufacturing systems for smart factory", Journal of the Korean Operations Research and Management Science Society, 42(4), pp.15~29 (2017)
- Park, K., "Performance models of multi-stage Bernoulli lines with multiple product and dedicated buffers", Journal of Korean Society of Industrial and Systems Engineering, 44(3), pp.22~32 (2021)
- Park, K., "Improving productivity of a multiproduct machining line at a motorcycle manufacturing plant", International Journal of Production Research, 57(2), pp.470~487 (2019)
- Park, K., "Scheduling policy in flexible Bernoulli lines with dedicated finite buffers", Journal of Manufacturing Systems, 48, pp.33~48 (2018)
- Syrowicz, D. A., "Decomposition analysis of a deterministic, multi-part-type, multiple-failure-mode production line", Doctor, pp.1999
- Wang, C., "Approximate analysis of reentrant lines with Bernoulli reliability model", IEEE Transactions on Automation Science and Engineering, 7(3), pp.708~715 (2010)
- Wang, M., "Transients in flexible manufacturing systems with setups and batch operations:Modeling, analysis, and design", IISE Transactions, 53(5), pp.523~540 (2021)
- Zhao, C., "Efficient algorithms for analysis and improvement of flexible manufacturing systems", IEEE Transactions on Automation Science and Engineering, 13(1), pp.105~121 (2016)
- Zhao, C., "Flexible lines with setups: Analysis, improvement, and application", IEEE Robotics and Automation Letters, 2(1), pp.120~127 (2017)
