서울시 재개발사업의 사업단계별 소요기간에 미치는 영향요인 분석

Analysis of Influence Factors on the Required Period for Each Project Stage of Redevelopment Project in Seoul

0

조회

0

다운로드

0

인용

0

참고문헌

키워드

초록

This study empirically analyzes the major factors that influenced the phase-by-step project period through empirical analysis of the redevelopment projects carried out in Seoul, especially those that have been designated as maintenance zones and completed since 2000. As a result of the analysis, it was found that there are significant differences in the influencing factors and degree of each stage of the project, and that the influence of economic indicators is greater than the characteristics of the business site. This may mean that since 2003, when the institutional standards were established, the discriminating power of planning factors related to business performance, such as floor area ratio, has decreased, and the impact on the project period has decreased. On the other hand, the increased influence of economic indicators that are highly relevant to the real estate market, such as mortgage loan ratios, can be seen as a reflection of the perception of economic benefits and accumulated experience of stakeholders in projects. This study confirms that the redevelopment project still has many limitations in terms of the improvement of the urban residential environment and the timeliness of housing supply, and suggests the need for active system improvement to ensure that various policy measures can be appropriately applied according to the economic situation in the designation of maintenance zones and the implementation of projects in the future.

Abstract

This study empirically analyzes the major factors that influenced the phase-by-step project period through empirical analysis of the redevelopment projects carried out in Seoul, especially those that have been designated as maintenance zones and completed since 2000. As a result of the analysis, it was found that there are significant differences in the influencing factors and degree of each stage of the project, and that the influence of economic indicators is greater than the characteristics of the business site. This may mean that since 2003, when the institutional standards were established, the discriminating power of planning factors related to business performance, such as floor area ratio, has decreased, and the impact on the project period has decreased. On the other hand, the increased influence of economic indicators that are highly relevant to the real estate market, such as mortgage loan ratios, can be seen as a reflection of the perception of economic benefits and accumulated experience of stakeholders in projects. This study confirms that the redevelopment project still has many limitations in terms of the improvement of the urban residential environment and the timeliness of housing supply, and suggests the need for active system improvement to ensure that various policy measures can be appropriately applied according to the economic situation in the designation of maintenance zones and the implementation of projects in the future.

참고문헌 (22)

  1. 21C대비 노후·불량주택 정비제도 개선방안 연구, "건설교통부", ~ (2000)
  2. 김두섭, "회귀분석 기초와 응용" (2017), (주)나남
  3. 김병호, "도시 및 주거환경정비법 제정이 주택재개발사업 기간에 미치는 영향 분석", 석사, 도시공학, pp.2009
  4. 김정규, "주택재개발(재건축)정비사업에 있어 추정분담금 제도의 적용방법에 따른 개선 연구 : 추정사업비를 중심으로", 도시재생, 4(2), pp.75~110 (2018)
  5. 재개발사업 지연요인 및 개선 방안 - 서울시를 중심으로 -, "김지은", 주택산업연구원, ~ (2015)
  6. 김지영, "재개발 사업기간의 영향요인 분석에 관한 연구 : 도시정비법 개정을 중심으로", 부동산연구, 33(4), pp.7~20 (2023)
  7. 김호철, "주택개량재개발 사업에서의 사업소요기간에 영향을 미치는 요인 분석", 도시행정학보, 10, pp.45~62 (1997)
  8. 남진, "도시정비론" (2023), 기문당
  9. 박희태, "재개발사업 구역의 입지 및 인구·사회적 특성이 재개발사업의 추진 속도에 미치는 영향", 박사, pp.2019
  10. 손동진, "재개발과 재건축의 소요기간에 대한 영향요인 비교분석", 부동산 도시연구, 14(2), pp.25~46 (2022)
  11. 신수임, "서울시 주택재개발사업의 사업소요기간에 영향을 미치는 요인분석", 2006대한국토․도시계획학회 추계학술대회 논문집 (2006)
  12. 신현주, "주택 재개발 사업시행기간에 영향을 미치는 요인에 관한 연구", 대한국토․도시계획학회 2004 정기학술대회 논문집, 1(1), pp.643~654 (2004)
  13. 오문현, "주택시장 변화에 따른 서울시 주택재개발 사업기간의 영향요인 연구", 석사, 도시공학과, pp.2013
  14. 이도길, "재개발사업사업기간에 영향을 미치는 요인에 관한 연구", 도시행정학보, 23(3), pp.237~252 (2010)
  15. 이재원, "도시정비형 재개발사업 소요기간의 영향요인-사업구역과 경제적및 입지적 특성을 바탕으로-", 한국건설관리학회 논문집, 22(3), pp.61~68 (2021)
  16. 장영현, "생존분석을 활용한 주택재개발사업 시행기간에 영향을 미치는 요인 분석 : 서울시 재개발사업지를 중심으로", 석사, 부동산학, pp.2008
  17. 전재문, "도시정비사업 공공지원제도 개선방안 연구", 박사, pp.2020
  18. 한국도시계획가협회, "도시계획 이론과 실제" (2021), 기문당
  19. "서울시"[URL]
  20. "한국은행"[URL]
  21. "국토교통부"[URL]
  22. "한국부동산원"[URL]

관련 논문AI추천

이 간행물의 다른 논문 (7건)