최적화된 수차모델이 적용된 소수력발전후보지에 대한 경제적 타당성 분석

Economic Feasibility Study for the Small Hydropower Generation Candidates with Optimized Hydraulic Turbine Model

1

조회

0

다운로드

0

인용

0

참고문헌

키워드

초록

Small hydropower (SHP) has recently been attracting attention as an environmentally friendly renewable energyresource that can cope with the problem of greenhouse gases. In addition, it can supply energy stably due to its lower price of powergeneration and longer lifetime than other renewable technologies. Despite these advantages, the growth rates of SHP have been ratherdisappointing. This is due to its poor economic viability, resulting from its high initial investment cost and low power generationcapacity. In this study, we conduct not only an economic feasibility study for the SHP candidates with optimized hydraulic turbinemodel under consideration by the Korea Water Resources Corporation (K-Water) but also give priority to the introduction of SHP. Furthermore, a sensitivity analysis is conducted to reveal the effects of 3 factors, namely the discount rate, power generation price andmaintenance cost ratio.

Abstract

Small hydropower (SHP) has recently been attracting attention as an environmentally friendly renewable energyresource that can cope with the problem of greenhouse gases. In addition, it can supply energy stably due to its lower price of powergeneration and longer lifetime than other renewable technologies. Despite these advantages, the growth rates of SHP have been ratherdisappointing. This is due to its poor economic viability, resulting from its high initial investment cost and low power generationcapacity. In this study, we conduct not only an economic feasibility study for the SHP candidates with optimized hydraulic turbinemodel under consideration by the Korea Water Resources Corporation (K-Water) but also give priority to the introduction of SHP. Furthermore, a sensitivity analysis is conducted to reveal the effects of 3 factors, namely the discount rate, power generation price andmaintenance cost ratio.

참고문헌 (12)

  1. Christina Ioannidou, "Eco-friendly location of small hydropower", European Journal of Operational Reserach, pp.1~12 (2016)
  2. Korea Energy Agency, "Renewable energy RD&D strategy 2030, Small hydropower", pp.5~6 (2007)
  3. ESHA, "Small Hydropower Roadmap: Condensed research data for EU-27", pp.4~ (2012)
  4. 정근주, "발전실적에 의한 낙동강 소수력발전소의 경제성 분석", 한국건축친환경설비학회 논문집, 9(5), pp.293~300 (2015), 한국건축친환경설비학회
  5. Korea Development Institute, "General guidelines for carrying out preliminary feasibility studies for enterprise and quasi-governmental projects", pp.132~133 (2013)
  6. National Law Information Center, "Act No.14544, 17., ACT ON CONSTRUCTION OF DAMS AND ASSISTANCE, ETC. TO THEIR ENVIRONS" (2017)
  7. Korea Development Institute, "Revised and supplemented standard guidelines for preliminary feasibility studies of water sector projects", 480~ (2008)
  8. "SMP (2007-2016)"[URL]
  9. Korea Energy Economics Institute, "Effect analysis on resource mix plan for new government", pp.5~ (2017)
  10. Korea Energy Agency, "Domestic emissions trading system price trends and future prospects", KEA Energy Issue Briefing, 60 (2017)
  11. Korea Institute of Energy Research, "Economic feasibility Analysis for Renewable Energy Resources", pp.16~17 (2007)
  12. Zin-Oh Kim, "Analysis of Economic Feasibility of New & Renewable Energies", New Renew. Energy, pp.79~86 (2005)