This study is about comparing coal thermal plant to LNG combined power plant in respect ofenvironmental and economic cost analysis. In addition sensitive analysis of power cost anddiscount rate is conducted to compare the result of change in endogenous and exogenousvariable. For environmental assessment, when they generate 10,669GWh yearly, coal thermalpower plant emits sulfur oxides 959ton, nitrogen oxide 690ton, particulate matter 168ton andLNG combined power plant emits only nitrogen oxide 886ton respectively every year. Regarding economic cost analysis on both power plants during persisting period 30 years, coalthermal power plant is more cost effective 4,751 billion won than LNG combined taking inaccount the initial, operational, energy and environmental cost at 10,669GWh yearly in spiteof only LNG combined power plant’s energy cost higher than coal thermal. In case ofsensitive analysis of power cost and discount rate, as 1% rise or drop in power cost, the totalcost of coal thermal power plant increases or decreases 81 billion won and LNG combined157 billion won up or down respectively. When discount rate 1% higher, the cost of coalthermal and LNG combined power plant decrease 498 billion won and 539 billion won foreach. When discount rate 1% lower, the cost of both power plant increase 539 billion wonand 837 billion won. With comparing each result of change in power cost and discount rate,as discount rate is weigher than power cost, which means most influential variable of powerplan is discount rate one of exogenous variables not endogenous.
Abstract
This study is about comparing coal thermal plant to LNG combined power plant in respect ofenvironmental and economic cost analysis. In addition sensitive analysis of power cost anddiscount rate is conducted to compare the result of change in endogenous and exogenousvariable. For environmental assessment, when they generate 10,669GWh yearly, coal thermalpower plant emits sulfur oxides 959ton, nitrogen oxide 690ton, particulate matter 168ton andLNG combined power plant emits only nitrogen oxide 886ton respectively every year. Regarding economic cost analysis on both power plants during persisting period 30 years, coalthermal power plant is more cost effective 4,751 billion won than LNG combined taking inaccount the initial, operational, energy and environmental cost at 10,669GWh yearly in spiteof only LNG combined power plant’s energy cost higher than coal thermal. In case ofsensitive analysis of power cost and discount rate, as 1% rise or drop in power cost, the totalcost of coal thermal power plant increases or decreases 81 billion won and LNG combined157 billion won up or down respectively. When discount rate 1% higher, the cost of coalthermal and LNG combined power plant decrease 498 billion won and 539 billion won foreach. When discount rate 1% lower, the cost of both power plant increase 539 billion wonand 837 billion won. With comparing each result of change in power cost and discount rate,as discount rate is weigher than power cost, which means most influential variable of powerplan is discount rate one of exogenous variables not endogenous.
참고문헌 (21)
- 최은호, "CNG 하이브리드 버스 도입의 경제성 평가", 에너지기후변화학회지, 6(2), pp.3~18 (2011), 한국에너지기후변화학회
- 최기주, "수도권 도심 대기질 개선을 위한 환경지역의 운영전략 및 평가에 관한 연구", 대한토목학회 논문집D, 29(6), pp.693~702 (2009), 대한토목학회
- Fann, N., "The Influence of Location, Source, and Emission Type in Estimates of the Human Health Benefits of Reducing a ton of Air Pollution", Air Quality, Amosphere and Health, 2(3), pp.169~176 (2009)
- Holland M, "BeTa Version E1.02a Benefits Table database: Estimates of the marginal external costs of air pollution in Europe" (2002), netcen
- A Feasibility Study on LNG Vehicle Promotion Program, "Kang, Kwang-Kyu", Korea Environment Institute, ~ (2010)
- Environmental Impact and Economic Analysis for Expanding Young-Heung Power Plants, "Kang, Kwang-Kyu", Korea Environment Institute, ~ (2012)
- Construction Feasibility on Yeongheung 7&8, "KEPCO Engineering & Construction", KEPCO Engineering & Construction, ~ (2010)
- Kim, Jong-Won, "A Study on Environmental Evaluation and Feasible Subsidy of CNG-Hybrid Bus Comparing Euro-6 Diesel Bus", Journal of Energy & Climate Change, 11(2), pp.140~147 (2016)
- "Korea Development Institute" (2008)[URL]
- Report on Yeongheung 7&8, "Korea South-East Power", Korea South-East Power, ~ (2012)
- Impact Analysis of Air Quality by Air Pollution Emitted from Large Stationary Emission Sources, "Lee, Seung-Min", Korea Environment Institute, ~ (2015)
- Economics of Greenhouse Gas Limitations: The indirect costs and benefits of greenhouse gas limitations, "Markandya, A.", UNEP, ~ (1988)
- "Ministry of Environment" (2017)[URL]
- Oh, Seok-Hyun, "A Study on Benefit Calculation of CHP in Energy System Considering Technical Characteristic of Power System Operation", Doctor, pp.2012
- Park, Sang-Cheol, "A Study on Problems and Improvements of Environmental Impact Assessment System", Master, pp.1997
- 박동원, "영흥화력발전소 부지에서 석탄재 매립이 지하수에 미치는 영향", 석사, 지구시스템과학과, pp.2013
- Update of the Handbook on External Costs of Transport, "Ricardo-AEA", European Commission, ~ (2014)