극한환경에서의 소형풍력발전 실증운전
Demonstration of 10kW Wind Turbine System at the King Sejong Station
1
조회
0
다운로드
2
인용
0
참고문헌
키워드
초록
Abstract
10kW wind turbine has been successfully commissioned at the King Sejong station in April, 2006. The wind turbine installed is a part of the R&D program for developing a solid wind/diesel hybrid power control system for a remote area such as Antarctica. At the same time, the current research aims to develop an anti-icing and de-icing technologies for a small wind turbine rated under 50kW.Since its commissioning, the turbine has generated about 500kWh for 47days without any system faults. Although sufficient data have not been obtained yet, any trouble has not occurred in the wind/diesel hybrid system based on the current analysis.Concerning on the environmental impact by the wind turbine operation, the turbine is installed within the station boundary in order to meet the Madrid protocol. Therefore, wind turbine operation meets the international requirements for preservation of antarctic ecosystem.
참고문헌 (3)
- "남극 세종기지 기상연보(1994-1996)" (1998)
- "극지 풍력발전시스템 개발 및 운영 1차년도 보고서" (2005), 한국에너지기술연구원
- "Wind-Diesel Hybrid Operation at the King Sejong Station" (2006)