Commercial wind farm design tools and the national wind map are used to determine the implementation potential of offshore wind power in Korea in this study. For this, the territorial waters of Korea were divided into nine analysis regions and a commercial CFD code was used to obtain wind resource maps at 100m A.S.L. which is the hub height of a 5MW wind turbine used in this study. With the wind resource obtained, factors including water depth, distance from substations, minimum and maximum capacity of a wind farm, distance between turbines and wind farms were considered to determine wind power potential. Also, the conservation areas, military zones, ports, fishing grounds, etc. were considered and excluded. As the result, a total capacity of 6,720 MW was found to be the implementation potential and this corresponds to 3.38 MW/km2 in API. Also if the distance from the substation is not considered, the potential increased to be 10,040 MW. This offshore wind farm potential is considered enough to satisfy the target of wind farm capacities in the 7th national plan for electricity demand and supply.
Abstract
Commercial wind farm design tools and the national wind map are used to determine the implementation potential of offshore wind power in Korea in this study. For this, the territorial waters of Korea were divided into nine analysis regions and a commercial CFD code was used to obtain wind resource maps at 100m A.S.L. which is the hub height of a 5MW wind turbine used in this study. With the wind resource obtained, factors including water depth, distance from substations, minimum and maximum capacity of a wind farm, distance between turbines and wind farms were considered to determine wind power potential. Also, the conservation areas, military zones, ports, fishing grounds, etc. were considered and excluded. As the result, a total capacity of 6,720 MW was found to be the implementation potential and this corresponds to 3.38 MW/km2 in API. Also if the distance from the substation is not considered, the potential increased to be 10,040 MW. This offshore wind farm potential is considered enough to satisfy the target of wind farm capacities in the 7th national plan for electricity demand and supply.
참고문헌 (12)
- "Offshore Wind Energy Development Roadmap", Ministry of Knowledge Economy, ~ (2011)
- The Southwest Coast 2.5GW Offshore Synthesis Promotion Plan, , Ministry of Trade, Industry and Energy, ~ (2011)
- Fourth Basic Plan for Renewable Energy Plan, , Ministry of Trade, Industry and Energy, ~ (2014)
- Seventh Basic Plan for Electricity Supply and Demand, , Ministry of Trade, Industry and Energy, ~ (2015)
- Global Wind Report Annual Market Update 2014, , Global Wind Energy Council, ~ (2014)
- 김현구, "국토환경성평가에 의한 육상 풍력자원 잠재량 산정", 한국환경과학회지, 22(6), pp.717~721 (2013), 한국환경과학회[DOI]
- 김현구, "남한 풍력자원 잠재량의 예비적 산정", 한국태양에너지학회 논문집, 28(6), pp.1~7 (2008), 한국태양에너지학회
- "KIER-Wind Energy R&D Center" (2009)[URL]
- "CGIAR-CSI, SRTM 90m Digital Elevation Data" (2008)[URL]
- "Ministry of Environment Spatial Information and Services" (2013)[URL]
- D. L. Elliott, "Wind Energy Resource Atlas of the United States", ~ (1986)
- "Korea Hydrographic and Oceanographic Agency" (2013)[URL]