본문 바로가기
KERD
논문KCI 등재

Hydropower dams in Laos: a solution to economic development? The case of the Nam Theun 2 Dam

0

조회

0

다운로드

2

인용

0

참고문헌

키워드

주제분류학제간연구

초록

This study evaluates the impacts of hydropower dams on the modernization of Laos since the 1990s with the case study of the Nam Theun 2 Dam. Hydropower development in Laos is as an example of governmental commitment to achieving socio-economic development, and private players and international donor agencies, such as the World Bank and the Asian Development Bank have accelerated the expansion of hydropower dams in the country. The case study of the Nam Theun 2 Dam discloses a strong drive by the public sector for hydropower development, a rapid establishment of hydropower export, and the contribution of dam projects to boosting local economy. Long-term challenges are ahead, including ill-management of environmental issues, little voice from civil society, and a lack of vision for hydropower projects to balance between socio-economic development and environmental protection. It is concluded that the achievements gained through hydropower development in Laos can be offset by social and environmental issues, which should properly be tackled by the government in the near future.

Abstract

This study evaluates the impacts of hydropower dams on the modernization of Laos since the 1990s with the case study of the Nam Theun 2 Dam. Hydropower development in Laos is as an example of governmental commitment to achieving socio-economic development, and private players and international donor agencies, such as the World Bank and the Asian Development Bank have accelerated the expansion of hydropower dams in the country. The case study of the Nam Theun 2 Dam discloses a strong drive by the public sector for hydropower development, a rapid establishment of hydropower export, and the contribution of dam projects to boosting local economy. Long-term challenges are ahead, including ill-management of environmental issues, little voice from civil society, and a lack of vision for hydropower projects to balance between socio-economic development and environmental protection. It is concluded that the achievements gained through hydropower development in Laos can be offset by social and environmental issues, which should properly be tackled by the government in the near future.

참고문헌 (33)

  1. Baird, G., "The people and their river, the World Bank and its dam : Revisiting the Xe Bang Fai River in Laos", Development and Change, 46(5), pp.1080~1105 (2015)
  2. Bao, P., "Integrated approach for sustainable hydropower development in the Mekong River basin", Environment and Resources Research, 7(1), pp.60~75 (2017)
  3. Analyzing economic tradeoffs of water use in the Nam Ngum River Basin, Lao PDR, "Bartlett, R.", Duke Environmental Economics, ~, pp.Duke Environmental Economics Working Paper Series, EE12-10 (2012)
  4. Department of Energy Policy and Planning, "Electricity statistics yearbook 2015 of Lao PDR. Department of Energy Policy and Planning", Ministry of Energy and Mines, ~ (2015)
  5. Elyer, B., "Briefing: A Call for strategic, basin-wide energy planning in Laos", Stimson, ~ (2017)
  6. Equator Principles Association, "The Equator Principles III", ~ (2017)
  7. Gardiner, M., "Best practices guide: Implementing power sector reform", The United States Agency for International Development, ~ (2000)
  8. Geheb, K., "Hydropower development in the Mekong Region: Political, socio-economic and environmental perspectives" (2015), Earthscan
  9. Grumbine, E., "Mekong hydropower development", Science, 332(6026), pp.178~179 (2011)
  10. MRC Strategic Environmental Assessment (SEA) of hydropower on the Mekong mainstream, "ICEM", International Center for Environmental Management, ~ (2010)
  11. International Rivers, "The World Bank and Dams – Part 2: Dispelling Myths of Nam Theun", ~ (2015)
  12. Ironside, C., "Hydropower Sustainability Assessment Protocol", International Hydropower Association, ~ (2015)
  13. Lee, S., "Benefit sharing in the Mekong River Basin", Water International, 40(1), pp.139~152 (2015)
  14. The Lao economy: Capitalizing on natural resource exports, "Menon, J.", ADB, ~, pp.ADB Economic Working Paper Series No 330 (2013)
  15. Middleton, C., "Contested Waterscapes in the Mekong Region: hydropower livelihoods and governance", pp.23~54 (2009), Earthscan
  16. Middleton, C., "Hydropower Development in the Mekong Region: political, socio-economic and environmental perspectives" (2015), Earthscan
  17. Molle, F., "Contested waterscapes in the Mekong Region: Hydropower, livelihoods and governance", pp.22~ (2009), Earthscan
  18. Ministry of Energy & Mines, "Electricity statistics yearbook 2015 of Lao P.D.R. Department of Energy Policy and Planning", Ministry of Energy and Mines, ~ (2016)
  19. Nam Theun 2 Power Company, "Nam Theun 2 power company brochure", ~
  20. Phonekeo, D., "Opportunity and challenges for sustainable hydropower development using private sector partnership", Proceedings of the 2014 international conference on development and cooperation of the Mekong Region (2014), Seoul National University
  21. Phongoudome, C., "Overview of energy development in Lao PDR", National Agriculture and Forestry Research Institute, Ministry of Agriculture and Forestry, ~ (2015)
  22. Shrestha, O., "Greater Mekong Subregion", Institution of Southeast Asian Studies, ~ (2013)
  23. Singh, S., "World Bank-directed development? Negotiating participation in the Nam Theun 2 hydropower project in Laos", Development and Change, 40(3), pp.487~507 (2009)
  24. Smits, M., "Towards a green economy: In search of sustainable energy policies for the future" (2012), Konrad Adenauer Stiftung
  25. "Nam Theun 2 project brief" (2010)[URL]
  26. World Bank, "Nam Theun 2 multi-purpose development project: Overview and update", ~ (2012)
  27. World Bank and Asian Development Bank, "Update on the Lao PDR Nam Theun 2 (NT2) hydroelectric project", World Bank and Asian Development Bank, ~ (2010)
  28. "Interview 1, 2015: Director at the Ministry of Energy and Mines, Laos", ~ (2015)
  29. "Interview 2, 2015: Engineer at the Mekong River Commission", ~ (2015)
  30. "Interview 3, 2015: Chief Engineer at the Nam Theun 2 Dam", ~ (2015)
  31. "Interview 4, 2015: Village head at a Resettlement Village near the Nam Theun 2 Dam", ~ (2015)
  32. "Interview 5, 2015: Manager at the Department of Energy Business, the Ministry of Energy and Mines", ~ (2015)
  33. "Interview 6, 2017: Southeast Asia Program Director, International Rivers, Bangkok", ~ (2017)

관련 논문AI추천

이 간행물의 다른 논문 (6건)