본문 바로가기
KERD
논문KCI 등재

The Effectiveness of Implementing Agile Project Management: A Systematic Literature Review

2

조회

0

다운로드

1

인용

0

참고문헌

키워드

초록

Purpose: The paper's primary goal is to provide a concise summary of the key challenges associated with agile project management (APM) and how these challenges affect the overall effectiveness of APM. Design/methodology/approach: The authors used a systematic literature review (SLR) methodology to synthesize research r igorously. Two hundred papers were identified in the f irst s tep, and a f inal sample of 95 paper studies was synthesized. Findings: The findings of this study reveal a total of 677 factors from various papers that have been classified into four distinct categories: customer, organizational, team, and project management methodology (PMM). The primary obstacles to implementing APM encompass knowledge, culture, characteristics, support, and communication. Research limitations/implications: Further analysis still needs to be done to explore how to overcome challenges in implementing APM. Originality/value: This study will be used as a reference as a starting point for further qualitative and quantitative studies to explore the effectiveness of APM.

Abstract

Purpose: The paper's primary goal is to provide a concise summary of the key challenges associated with agile project management (APM) and how these challenges affect the overall effectiveness of APM. Design/methodology/approach: The authors used a systematic literature review (SLR) methodology to synthesize research r igorously. Two hundred papers were identified in the f irst s tep, and a f inal sample of 95 paper studies was synthesized. Findings: The findings of this study reveal a total of 677 factors from various papers that have been classified into four distinct categories: customer, organizational, team, and project management methodology (PMM). The primary obstacles to implementing APM encompass knowledge, culture, characteristics, support, and communication. Research limitations/implications: Further analysis still needs to be done to explore how to overcome challenges in implementing APM. Originality/value: This study will be used as a reference as a starting point for further qualitative and quantitative studies to explore the effectiveness of APM.

참고문헌 (113)

  1. Agbejule, A., "The relationship between traditional project management, agile project management and teamwork quality on project success", International Journal of Organizational Analysis, 30(7), pp.124~136 (2022)[DOI]
  2. Ahimbisibwe, A., "A contingency fit model of critical success factors for software development projects : A comparison of agile and traditional plan-based methodologies", Journal of Enterprise Information Management, 28(1), pp.7~33 (2015)[DOI]
  3. Ahmed, R., "Systematic literature review of project manager's leadership competencies", Engineering, construction and architectural management, 28(1), pp.1~30 (2021)[DOI]
  4. Alamsjah, F., "Ambidextrous leadership of publicly listed companies during turbulent times : The importance of agility and alliance capability", Global Business and Finance Review, 27(3), pp.41~55 (2022)[DOI]
  5. Almeida, F., "Challenges and facilitators practices for knowledge management in large-scale scrum teams", Journal of Information Technology Case and Application Research, 21(2), pp.90~102 (2019)
  6. Almeida, F., "Challenges and facilitators practices for knowledge management in large-scale scrum teams", Journal of Information Technology Case and Application Research, 21(2), pp.90~102 (2019)[DOI]
  7. Alsaqaf, W., "Quality requirements challenges in the context of large-scale distributed agile : An empirical study", Information and Software Technology, 110, pp.39~55 (2019)[DOI]
  8. Altuwaijri, F. S., "Factors affecting Agile adoption : An industry research study of the mobile app sector in Saudi Arabia", Journal of Systems and Software, 190 (2022)[DOI]
  9. Alves, E. J., "Agile project portfolio management as a strategic enabler in the Brazilian marketplace : five case studies and one substantive theory", International Journal of Managing Projects in Business, 16(3), pp.475~495 (2023)
  10. Alzoubi, Y. I., "Empirical studies of geographically distributed agile development communication challenges : A systematic review", Information and Management, 53(1), pp.22~37 (2016)[DOI]
  11. Annosi, M. C., "Learning in an agile setting : A multilevel research study on the evolution of organizational routines", Journal of Business Research, 110, pp.554~566 (2020)[DOI]
  12. Aoufi, A., "How to outsource agile projects effectively : Suppliers and client advisors need to work closely with client organizations to ensure key enablers are in place to increase success when outsourcing agile projects", Research Technology Management, 65(1), pp.59~66 (2021)[DOI]
  13. Arefazar, Y., "Prioritizing agile project management strategies as a change management tool in construction projects", International Journal of Construction Management, 22(4), pp.678~689 (2022)[DOI]
  14. Azanha, A., "Agile project management with Scrum : A case study of a Brazilian pharmaceutical company IT project", International Journal of Managing Projects in Business, 10(1), pp.121~142 (2017)[DOI]
  15. Badakhshan, P., "Agile business process management : A systematic literature review and an integrated framework", Business Process Management Journal, 26(6), pp.1505~1523 (2020)[DOI]
  16. Baham, C., "An agile methodology for the disaster recovery of information systems under Catastrophic scenarios", Journal of Management Information Systems, 34(3), pp.633~663 (2017)[DOI]
  17. Baik, Y., "Small knowledge-intensive firms' innovation and performance : The moderating effects of organizational change", Global Business and Finance Review, 25(2), pp.51~63 (2020)[DOI]
  18. Balve, P., "Applying the Kanban method in problem-based project work : A case study in a manufacturing engineering bachelor's programme at Aalborg University Copenhagen", European Journal of Engineering Education, 42(6), pp.1512~1530 (2017)[DOI]
  19. Baxter, D., "Why Scrum works in new product development : the role of social capital in managing complexity", Production Planning & Control, 34(13), pp.1248~1260 (2023)
  20. Bechtel, J., "The interplay between dynamic capabilities' dimensions and their relationship to project portfolio agility and success", International Journal of Project Management, 41(4), pp.102469~ (2023)[DOI]
  21. Bergmann, T., "Agile project management and project success : A literature review", Advances in Intelligent Systems and Computing, 783, pp.405~414 (2019)[DOI]
  22. Bott, M., "An analysis of theories supporting agile scrum and the use of scrum in systems engineering", EMJ-Engineering Management Journal, 32(2), pp.76~85 (2020)[DOI]
  23. Brandl, F. J., "Selecting practices in complex technical planning projects : A pathway for tailoring agile project management into the manufacturing industry", CIRP Journal of Manufacturing Science and Technology, 33, pp.293~305 (2021)[DOI]
  24. Choi, S. B., "A multilevel study of the relationship between leader agreeable communication style and team creativity : Knowledge sharing as mediator and knowledge ownership as moderator", Global Business and Finance Review, 27(4), pp.27~45 (2022)[DOI]
  25. Ciric Lalic, D., "How project management approach impact project success? From traditional to agile", International Journal of Managing Projects in Business, 15(3), pp.494~521 (2022)[DOI]
  26. Collignon, S. E., "Agile systems development : Privacy theoretical lens to challenge the full information disclosure paradigm", Information & Management, 59(6), pp.103679~ (2022)[DOI]
  27. Conforto, E. C., "The agility construct on project management theory", International Journal of Project Management, 34(4), pp.660~674 (2016)[DOI]
  28. Conforto, E. C., "Can agile project management be adopted by industries other than software development", Project Management Journal, 45(3), pp.21~34 (2014)[DOI]
  29. Cooper, R. G., "New-product portfolio management with agile : Challenges and solutions for manufacturers using agile development methods", Research Technology Management, 63(1), pp.29~38 (2020)[DOI]
  30. Cram, W. A., "Agile development in practice : Lessons from the trenches", Information Systems Management, 36(1), pp.2~14 (2019)[DOI]
  31. Cubric, M., "An agile method for teaching agile in business schools", International Journal of Management Education, 11(3), pp.119~131 (2013)[DOI]
  32. Daneva, M., "Agile requirements prioritization in large-scale outsourced system projects : An empirical study", Journal of Systems and Software, 86(5), pp.1333~1353 (2013)[DOI]
  33. de Borba, J. C. R., "Agile management in product development", Research Technology Management, 62(5), pp.63~67 (2019)[DOI]
  34. Dikert, K., "Challenges and success factors for large-scale agile transformations : A systematic literature review", Journal of Systems and Software, 119, pp.87~108 (2016)[DOI]
  35. Dingsøyr, T., "Coordinating knowledge work in multiteam programs : Findings from a large-scale agile development program", Project Management Journal, 49(6), pp.64~77 (2018)[DOI]
  36. Edkins, A., "Exploring the front-end of project management", Engineering Project Organization Journal, 3(2), pp.71~85 (2013)[DOI]
  37. F. Tripp, J., "Agile methodologies : organizational adoption motives, tailoring, and performance", Journal of Computer Information Systems, 58(2), pp.170~179 (2018)[DOI]
  38. Fearne, A., "The power of purpose-lessons in agility from the ventilator challenge", Supply Chain Management, 26(6), pp.753~766 (2021)[DOI]
  39. Garcia, V. M. B., "Contributions of entrepreneurial orientation in the use of agile methods in project management", Innovation and Management Review, 18(1), pp.17~33 (2021)[DOI]
  40. Gemino, A., "Agile, traditional, and hybrid approaches to project success:is hybrid a poor second choice?", Project Management Journal, 52(2), pp.161~175 (2021)[DOI]
  41. Gregory, P., "The challenges that challenge : Engaging with agile practitioners' concerns", Information and Software Technology, 77, pp.92~104 (2016)[DOI]
  42. Gupta, S., "Impact of IS agility and HR systems on job satisfaction : an organizational information processing theory perspective", Journal of Knowledge Management, 23(9), pp.1782~1805 (2019)[DOI]
  43. Heeager, L. T., "Intrafirm knowledge transfer of agile software practices : barriers and their relations", Journal of Information Technology Case and Application Research, 19(4), pp.199~224 (2017)[DOI]
  44. Hobbs, B., "Agile methods on large projects in large organizations", Project Management Journal 3 Project Management Journal, 48(3) (2017)[DOI]
  45. Howell, D., "A p roject contingency framework based on uncertainty and its consequences", International Journal of Project Management, 28(3), pp.256~264 (2010)[DOI]
  46. Hutter, K., "Scaling organizational agility : Key insights from an incumbent firm's agile transformation", Management Decision (2023)[DOI]
  47. Ichsan, M., "Bab 14 Project Management", Manajemen: Teori dan Perkembangannya (2021)
  48. Inayat, I., "A systematic literature review on agile requirements engineering practices and challenges", Computers in Human Behavior, 51, pp.915~929 (2015)[DOI]
  49. Islam, G., "A case study of agile software development for safety-critical systems projects", Reliability Engineering and System Safety, 200 (2020)[DOI]
  50. Ismail, S. N., "Influencing factors on safety culture in mining industry : A systematic literature review approach", Resources Policy, 74 (2021)[DOI]
  51. Jahr, M., "A hybrid approach to quantitative software project scheduling within agile frameworks", Project Management Journal, 45(3), pp.35~45 (2014)[DOI]
  52. Jalali, S., "Investigating the applicability of Agility assessment surveys : A case study", Journal of Systems and Software, 98, pp.172~190 (2014)[DOI]
  53. Javed, S., "Helping deluxe Beds to sleep easy : A case study of agile project management", International Journal of Entrepreneurship and Innovation, 22(2), pp.132~139 (2021)[DOI]
  54. Josyula, S. S., "How to make intelligent automation projects agile? Identification of success factors and an assessment approach", International Journal of Organizational Analysis, 31(5) (2021)[DOI]
  55. Kadenic, M. D., "Resilience of operating models : Exploring the potential of agile project management as enabler", International Journal of Managing Projects in Business, 16(3) (2023)[DOI]
  56. Kahl, J., "Agile strategies for middle managers", Management Decision, 60(1), pp.146~166 (2022)[DOI]
  57. Kasauli, R., "Requirements engineering challenges and practices in large-scale agile system development", Journal of Systems and Software, 172, pp.110851~ (2021)[DOI]
  58. Kasinath, H. M., "Understanding and using qualitative methods in performance measurement", MIER Journal of Educational Studies, 3(1), pp.46~57 (2013)
  59. Kaufmann, C., "Emerging strategy recognition in agile portfolios", International Journal of Project Management, 38(7), pp.429~440 (2020)[DOI]
  60. Koch, J., "Who is attracted and why? How agile project management influences employee's attraction and commitment", International Journal of Managing Projects in Business, 14(3), pp.699~720 (2021)[DOI]
  61. Kristof, A. L., "Person-organization fie an integrative review of its conceptualizations, measurement, and implications", Personnel Psychology, 49(1), pp.1~49 (1996)[DOI]
  62. Kumar, D., "Bringing agile practice to the classroom : Student voices of third-year major project implementation", African Journal of Science, Technology, Innovation and Development, 8(5-6), pp.423~428 (2016)[DOI]
  63. Kurniawan, R., "The impact of balanced agile project management on firm performance : the mediating role of market orientation and strategic agility", Review of International Business and Strategy, 30(4), pp.457~490 (2020)[DOI]
  64. Kurniawan, R., "Orchestrating internal and external resources to achieve agility and performance : The centrality of market orientation", Benchmarking, 28(2), pp.517~555 (2021)[DOI]
  65. Lappi, T., "Project governance in public sector agile software projects", International Journal of Managing Projects in Business, 10(2), pp.263~294 (2017)[DOI]
  66. Lappi, T., "Toward an improved understanding of agile project governance : A systematic literature review", Project Management Journal, 49(6), pp.39~63 (2018)[DOI]
  67. Lechler, T. G., "Exploring the role of project management in the development of the academic agile software discourse: A bibliometric analysis", Project Management Journal 3 Project Management Journal, 48(1) (2017)[DOI]
  68. Lee, H. K., "Developing CRMSys at SoftTel : Traditional or agile", Journal of Information Technology Case and Application Research, 23(4), pp.279~302 (2021)[DOI]
  69. Lehnen, J., "Bringing agile project management into lead user projects", Int. J. Product Development, 21(3) (2016)[DOI]
  70. Lindsjørn, Y., "Teamwork quality and project success in software development : A survey of agile development teams", Journal of Systems and Software, 122, pp.274~286 (2016)[DOI]
  71. Lindskog, C., "Balancing between stability and change in Agile teams", International Journal of Managing Projects in Business, 14(7), pp.1529~1554 (2021)[DOI]
  72. Malik, M., "Agile practices and performance : Examining the role of psychological empowerment", International Journal of Project Management, 39(1), pp.10~20 (2021)[DOI]
  73. Mansor, Z., "Validated agile cost management success factors in software development projects", Int. J. Advanced Intelligence Paradigms, 11(2), pp.5~18 (2018)
  74. Manurung, A. H., "Organizational agility : do agile project management and networking capability require market orientation", International Journal of Managing Projects in Business, 15(1), pp.1~35 (2022)[DOI]
  75. Marchwicka, E., "Adopting scrum methodology in the project of organising a concert", Int. J. Project Organisation and Management, 14(1), pp.1~19 (2022)
  76. Marder, B., "'Going agile' : Exploring the use of project management tools in fostering psychological safety in group work within management discipline courses", International Journal of Management Education, 19(3) (2021)[DOI]
  77. Marnada, P., "Agile project management challenge in handling scope and change : A systematic literature review", Procedia Computer Science, 197, pp.290~300 (2021)[DOI]
  78. Masood, Z. A., "The benefits and key challenges of agile project management under recent research opportunities the benefits and key challenges of agile project management under recent research opportunities view project", International Research Journal of Management Science, 5(1), pp.20~28 (2017)
  79. Medini, K., "A framework for agility improvement projects in the post mass customisation era", International Journal of Production Research, 61(20), pp.7105~7121 (2022)[DOI]
  80. Nicholls, G. M., "Determining when simplified Agile project management is r ight for small teams", EMJ-Engineering Management Journal, 27(1), pp.3~10 (2015)[DOI]
  81. Nurdiani, I., "The impacts of agile and lean practices on project constraints : A tertiary study", Journal of Systems and Software, 119, pp.162~183 (2016)[DOI]
  82. Olszewska, M., "Quantitatively measuring a large-scale agile transformation", Journal of Systems and Software, 117, pp.258~273 (2016)[DOI]
  83. Patel, J., "Using social intelligence to overcome agile adoption challenges", Journal of Computer Information Systems, 62(4), pp.740~751 (2022)[DOI]
  84. Pati, D., "How to write a systematic review of the literature", Health Environments Research and Design Journal, 11(1), pp.15~30 (2018)[DOI]
  85. Radhakrishnan, A., "The impact of project team characteristics and client collaboration on project agility and project success : An empirical study", European Management Journal, 40(5), pp.758~777 (2021)[DOI]
  86. Raharjo, T., "Agile project management challenges and mapping solutions: A systematic literature review", ACM International Conference Proceeding Series, pp.123~129 (2020)
  87. Saini, M., "Critical factors for transferring and sharing tacit knowledge within lean and agile construction processes", Construction Innovation, 18(1), pp.64~89 (2018)[DOI]
  88. Salman, A., "An empirical investigation of the impact of the communication and employee motivation on the project success using agile framework and its effect on the software development business", Business Perspectives and Research, 9(1), pp.46~61 (2021)[DOI]
  89. Schmitt, A., "Systematic literature review-improving business processes by implementing agile", Business Process Management Journal, 27(3), pp.868~882 (2020)[DOI]
  90. Senabre Hidalgo, E., "Adapting the scrum framework for agile project management in science : Case study of a distributed research initiative", Heliyon, 5(3), pp.e01447~ (2019)[DOI]
  91. Serrador, P., "Does agile work?-A quantitative analysis of agile project success", International Journal of Project Management, 33(5), pp.1040~1051 (2015)[DOI]
  92. Sharma, M., "Challenges to agile project management during COVID-19 pandemic:An emerging economy perspective", Operations Management Research, 15(1-2), pp.461~474 (2022)[DOI]
  93. Sheffield, J., "Factors associated with the software development agility of successful projects", International Journal of Project Management, 31(3), pp.459~472 (2013)[DOI]
  94. Shrivastava, S. V., "Categorization of risk factors for distributed agile projects", Information and Software Technology, 58, pp.373~387 (2015)[DOI]
  95. Sithambaram, J., "Issues and challenges impacting the successful management of agile-hybrid projects : A grounded theory approach", International Journal of Project Management, 39(5), pp.474~495 (2021)[DOI]
  96. Sreenivasan, A., "Agile readiness for sustainable operations in start-ups", International Journal of Innovation Science, 16(1) (2023)[DOI]
  97. Srivastava, P., "A leadership framework for distributed self-organized scrum teams", Team Performance Management, 23(5-6), pp.293~314 (2017)[DOI]
  98. Stankovic, D., "A survey study of critical success factors in agile software projects in former Yugoslavia IT companies", Journal of Systems and Software, 86(6), pp.1663~1678 (2013)[DOI]
  99. Stettina, C. J., "Agile portfolio management : An empirical perspective on the practice in use", International Journal of Project Management, 33(1), pp.140~152 (2015)[DOI]
  100. Stoddard, M. M., "Agile project management in libraries : Creating collaborative, resilient, responsive organizations", Journal of Library Administration, 59(5), pp.492~511 (2019)[DOI]
  101. Stormi, K. T., "Agile performance measurement system development : An answer to the need for adaptability", Journal of Accounting and Organizational Change, 15(2), pp.231~256 (2019)[DOI]
  102. Sun, W., "Control mechanisms and agile methodology use : Data from the industry", Journal of Computer Information Systems, 58(3), pp.234~243 (2018)[DOI]
  103. Sweetman, R., "Portfolios of agile projects : A complex adaptive systems' agent perspective", Project Management Journal, 49(6), pp.18~38 (2018)[DOI]
  104. Tam, C., "The factors influencing the success of on-going agile software development projects", International Journal of Project Management, 38(3), pp.165~176 (2020)[DOI]
  105. Taylor, K. J., "Adopting agile software development : The project manager experience", Information Technology and People, 29(4), pp.670~687 (2016)[DOI]
  106. Teece', D. J., "Dynamic capabilities and strategic management", Strategic Management Journal, 18(7), pp.509~533 (1997)
  107. Tsoy, M., "What are the critical success factors for agile analytics projects", Information Systems Management, 38(4), pp.324~341 (2021)[DOI]
  108. van Oorschot, K. E., "Under pressure : The effects of iteration lengths on agile software development performance", Project Management Journal, 49(6), pp.78~102 (2018)[DOI]
  109. Zakrzewska, M., "Enterprise agility-its meaning, managerial expectations and barriers to implementation-a survey of three countries", Journal of Organizational Change Management, 35(3), pp.488~510 (2022)[DOI]
  110. Zasa, F. P., "Managing the hybrid organization : How can agile and traditional project management coexist", Research Technology Management, 64(1), pp.54~63 (2020)[DOI]
  111. Zavyalova, E., "Agile vs traditional project management approaches : Comparing human resource management architectures", International Journal of Organizational Analysis, 28(5), pp.1095~1112 (2020)[DOI]
  112. Zielske, M., "Application of agile methods in traditional logistics companies and logistics startups : Results from a German delphi study", Journal of Systems and Software, 177, pp.110950~ (2021)[DOI]
  113. Zielske, M., "Agile methods used by traditional logistics companies and logistics start-ups : a systematic literature review", Journal of Systems and Software, 190, pp.111328~ (2022)[DOI]

관련 논문AI추천

이 간행물의 다른 논문 (14건)