초록

Based on the lessons from the Fukushima accident, new strategies to mitigate the spread of accidents in nuclear power plants have been established that consider portable equipment. The diverse and flexible coping strategies (FLEX) and multi-barrier accident coping strategy (MACST) based on the utilization of portable equipment are being adopted in case of an extended loss of all AC power and loss of ultimate heat sink. In this context, the establishment of specific strategies for utilizing portable equipment has emerged as an important issue. This study proposes a multi-unit probabilistic safety assessment (MUPSA)-based evaluation framework consisting of several steps to quantitatively assess the reduction in risk from the use of portable equipment at a multi-unit site, which can provide a basis for establishing optimal portable equipment strategies. According to the framework, after first defining the scope of the evaluation, risk-significant types of portable equipment are selected and the scenarios are analyzed. Risk reduction is then evaluated using modified MUPSA models according to the deployment of the portable equipment. A case study was conducted for an internal loss of off-site power (LOOP) and seismic LOOP focusing on how to evaluate the effectiveness of portable equipment through the developed framework.

Abstract

Based on the lessons from the Fukushima accident, new strategies to mitigate the spread of accidents in nuclear power plants have been established that consider portable equipment. The diverse and flexible coping strategies (FLEX) and multi-barrier accident coping strategy (MACST) based on the utilization of portable equipment are being adopted in case of an extended loss of all AC power and loss of ultimate heat sink. In this context, the establishment of specific strategies for utilizing portable equipment has emerged as an important issue. This study proposes a multi-unit probabilistic safety assessment (MUPSA)-based evaluation framework consisting of several steps to quantitatively assess the reduction in risk from the use of portable equipment at a multi-unit site, which can provide a basis for establishing optimal portable equipment strategies. According to the framework, after first defining the scope of the evaluation, risk-significant types of portable equipment are selected and the scenarios are analyzed. Risk reduction is then evaluated using modified MUPSA models according to the deployment of the portable equipment. A case study was conducted for an internal loss of off-site power (LOOP) and seismic LOOP focusing on how to evaluate the effectiveness of portable equipment through the developed framework.

참고문헌 (42)

  1. "2016", ~
  2. M. Wittas, "Lessons learned from incorporating temporary equipment into the Palo Verde configuration risk management program using NEI 16-06", Proceedings of the PSA 2017, pp.24~28 (2017)
  3. A. Prosek, "RELAP5", MOD3.3 analyses for prevention strategy of extended station blackout, 2015, pp.1, ~
  4. B. Kuzmanov, "Modeling and analysis of portable diesel-pump mitigation strategy implemented as a post-fukushima safety measure", Proceedings of BgNS International Conference: Nuclear Energy for the People (2018)
  5. Z. Tabadar, "Thermal-hydraulic modeling for deterministic safety analysis of portable equipment application in the VVER-1000nuclear reactor during loss of ultimate heat sink accident using RELAP5", MOD3.2code, 2019, pp.127, 53~67
  6. M. M. Rahman, "FLEX strategy to cope with extended SBO for APR1400", Int. J. Eng. Res. Technol, 5(10), pp.577~581 (2016)
  7. M. R. -Zapatero, "FLEX strategy implementation for LOCA sequences in PWR-westinghouse", Proceedings of 26th International Conference Nuclear Energy for New Europe (NENE) (2017)
  8. S. Alketbi, "Using artificial intelligence to identify the success window of FLEX strategy under an extended station blackout", Nucl. Eng. Des, 382, pp.111368~ (2021)
  9. H. K. Lim, "A conceptual comparative study of FLEX strategies to cope with Extended Station Blackout (SBO)", Proceedings of Probabilistic Safety Assessment and Management (PSAM), pp.16~21 (2018)
  10. B. Gjorgiev, "Improving nuclear power plant safety through independent water storage systems", Nucl. Eng. Des, 323, pp.8~15 (2017)
  11. S. Courtin, "Application of FLEX strategies to cope with a station blackout (SBO) situation", Proceedings of 31th International Conference Nuclear Energy for New Europe (NENE) (2022)
  12. Z. Tabadar, "Probabilistic safety assessment of portable equipment applied in VVER-1000", V446 nuclear reactor during loss of ultimate heat sink accident for stress test program development, 2019, pp.117, 103101~
  13. S. Courtin, "Risk reduction by means of FLEX strategies in pressurized water reactors", Nucl. Eng. Des, 414, pp.112656~ (2023)
  14. A. Hakobyan, "Implementation of FLEX strategies in surry pra", Proceedings of the PSA 2017, pp.24~28 (2017)
  15. A. U. A. Shah, "Dynamic probabilistic risk assessment based response surface approach for FLEX and accident tolerant fuels for medium break LOCA spectrum", Energies, 14, pp.2490~ (2021)
  16. A. U. A. Shah, "Sensitivity analysis of effectiveness of FLEX strategies using a CDF-based importance measure under accident conditions", Nucl. Sci. Eng, 197(11), pp.2818~2829 (2023)
  17. C. Paris, "Quantitative risk reduction by means of recovery strategies", Reliab. Eng. Syst. Saf, 182 (2019)
  18. Hong Xu, "A review of the FLEX strategy for nuclear safety", Nucl. Eng. Des, 382, pp.111396~ (2021)
  19. Hong Xu, "Diverse and flexible coping strategy for nuclear safety : opportunities and challenges", Energies, 15, pp.6275~ (2022)
  20. P. Chandran, "Implementation of FLEX operator actions in PRA models", Proceedings of the PSA 2017, pp.24~28 (2017)
  21. M. T. Hasan, "HEPs Calculation for FLEX Strategies in Response to APR1400 Extended SBO for Risk-Informed Decision Making", Transactions of the Korean Nuclear Society Autumn Meeting (2018)
  22. Y. Kim, "Estimating the performance time of FLEX implementation based on staffing level considering multi-unit accidents", Proceedings of the 33rd European Safety and Reliability Conference, ESREL 2023 (2023)
  23. I. S. Kim, "Holistic approach to multi-unit site risk assessment : status and issues", Nucl. Eng. Technol, 49, pp.286~294 (2017)
  24. T. Zhou, "Multi-unit nuclear power plant probabilistic risk assessment : a comprehensive survey", Reliab. Eng. Syst. Saf, 213, pp.107782~ (2019)
  25. D. -S. Kim, "A pragmatic approach to modeling combinations of plant operational states in multi-unit nuclear power plant probabilistic safety assessment", Appl. Sci, 12, pp.11486~ (2022)
  26. Multi-Unit Probabilistic Safety Assessment, "IAEA", IAEA, ~, pp.Safety Reports Series No. 110 (2021)
  27. S. Zhang, "Incorporating FLEX strategies in multi-unit probabilistic risk assessment", Proceedings of the 2020 28th International Conference on Nuclear Engineering Joint with the ASME 2020 Power Conference ICONE28-Power2020 (2020)
  28. S. -W. Lee, "Extended station blackout coping capabilities of APR1400", Sci. Technol. Nuclear Instal, 2014, pp.980418~ (2014)
  29. S. -Y. Park, "Evaluation of an accident management strategy of emergency water injection using fire engines in a typical pressurized water reactor", Nucl. Eng. Technol, 47, pp.719~728 (2015)
  30. C. H. Kim, "Assessment of plant response capability in the event of loss of electrical power and loss of ultimate heat sink", Ann. Nucl. Energy, 175, pp.209223~ (2022)
  31. C. G. Lee, "Development of operation strategy and recovery guideline during extended station blackout for OPR1000 and APR1400", Proceedings of the 18th International Topical Meeting on Nuclear Reactor Thermal Hydraulics (NURETH-18), pp.18~23 (2019)
  32. J. Kim, "Human Reliability Analysis of the FLEX", MACST Actions Deploying Portable Equipment, 2018, ~
  33. Y. A. Suh, "Time uncertainty analysis method for level 2 human reliability analysis of severe accident management strategies", Nucl. Eng. Technol, 53, pp.484~497 (2021)
  34. V. Yadav, "Utilizing FLEX equipment for operations and maintenance cost reduction in nuclear power plants", INL, 2019
  35. G. Schumock, "Integrated Risk-Informed Design(I-RID)methodological framework and computational application for FLEX equipment storage buildings of Nuclear Power Plants", Prog. Nucl. Energy, 120, pp.103186~ (2020)
  36. S. Zhang, "Multicriterion benefit evaluation methodology for safety enhancements in nuclear power plants and application for FLEX strategies", Nucl. Eng. Des, 376, pp.111135~ (2021)
  37. Revision and Redesignation of ASME, "ANS RA-S-2008, Standard for Level 1", Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications, The American Society of Mechanical Engineers and American Nuclear Society, pp.2022, ~[DOI]
  38. S. H. Han, "AIMS-MUPSA software package for multiunit PSA", Nucl. Eng. Technol, 50, pp.1255~1265 (2018)
  39. D. -S. Kim, "Multi-unit Level 1probabilistic safety assessment: approaches and their application to a six-unit nuclear power plant site", Nucl. Eng. Technol, 50 (2018)
  40. Industryaverage Performance for Components and Initiating Events at U.S. Commercial Nuclear Power Plants, "S. A. Eide", U.S. Nuclear Regulatory Commission, ~, pp.NUREG (2007), CR6928
  41. Seismic Probabilistic Risk Assessment Implementation Guide, "EPRI", ~, pp.Technical Report, 3002000709 (2013)
  42. Guidelines on Modeling Common-Cause Failure in Probabilistic Risk Assessment, "A. Mosleh", U. S. Nuclear Regulatory Commission, ~, pp.NUREG (1998), CR-5485, INEEL[DOI]

관련 논문AI추천

이 간행물의 다른 논문 (49건)