초록
For investigating whether the MARSSIM nonparametric test has sufficient statistical power when a sitehas a specific contamination distribution before conducting a final status survey (FSS), a novel approachwas proposed to predict the release probability of the site. Five distributions were assumed: lognormaldistribution, normal distribution, maximum extreme value distribution, minimum extreme value distribution, and uniform distribution. Hypothetical radioactivity populations were generated for eachdistribution, and Sign tests were performed to predict the release probabilities after extracting samplesusing Monte Carlo simulations. The designed Type I error (0.01, 0.05, and 0.1) was always satisfied for alldistributions, while the designed Type II error (0.01, 0.05, and 0.1) was not always met for the uniform,maximum extreme value, and lognormal distributions. Through detailed analyses for lognormal andnormal distributions which are often found for contaminants in actual environmental or soil samples, itwas found that a greater statistical power was obtained from survey units with normal distribution thanwith lognormal distribution. This study is expected to contribute to achieving the designed decision errorwhen the contamination distribution of a survey unit is identified, by predicting whether the survey unitpasses the statistical test before undertaking the FSS according to MARSSIM
Abstract
For investigating whether the MARSSIM nonparametric test has sufficient statistical power when a sitehas a specific contamination distribution before conducting a final status survey (FSS), a novel approachwas proposed to predict the release probability of the site. Five distributions were assumed: lognormaldistribution, normal distribution, maximum extreme value distribution, minimum extreme value distribution, and uniform distribution. Hypothetical radioactivity populations were generated for eachdistribution, and Sign tests were performed to predict the release probabilities after extracting samplesusing Monte Carlo simulations. The designed Type I error (0.01, 0.05, and 0.1) was always satisfied for alldistributions, while the designed Type II error (0.01, 0.05, and 0.1) was not always met for the uniform,maximum extreme value, and lognormal distributions. Through detailed analyses for lognormal andnormal distributions which are often found for contaminants in actual environmental or soil samples, itwas found that a greater statistical power was obtained from survey units with normal distribution thanwith lognormal distribution. This study is expected to contribute to achieving the designed decision errorwhen the contamination distribution of a survey unit is identified, by predicting whether the survey unitpasses the statistical test before undertaking the FSS according to MARSSIM
참고문헌 (21)
- Nuclear Power Plant Reactors in the World, Reference Data Series No.2, "International Atomic Energy Agency", IAEA, ~ (2020)
- Release of Sites from Regulatory Control on Termination of Practices, "International Atomic Energy Agency", IAEA, ~, pp.IAEA Safety Standard Series No. WS-G-5.1 (2006)
- Criteria for Reuse of Site and Remaining Buildings after Completion of Decommissioning of Nuclear Facilities, "Nuclear Safety and Security Commission", ~, pp.NSSC Notice No.2021-11 (2021)
- Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM), "United States Nuclear Regulatory Commission", USNRC, ~, pp.NUREG-1575, Rev.1 (2000)
- Connecticut Yankee Atomic Power Company, "Haddam Neck Plant License Termination Plan, Rev.7", ~ (2007)
- Maine Yankee Atomic Power Company, "Maine Yankee License Termination Plan, Rev.5", ~ (2009)
- S. B. Hong, "Practical application of the MARSSIM process to the site release of a uranium conversion plant following decommissioning", Ann. Nucl. Energy, 65, pp.241~246 (2014)
- Monitoring for Compliance with Decommissioning Termination Survey Criteria, "Oak Ridge National Laboratory", ~, pp.NUREG (1981), CR-2082
- Manual for Conducting Radiological Surveys in Support of License Termination, "Oak Ridge National Laboratory", ~, pp.NUREG (1992), CR-5849
- W. R. Ott, "A physical explanation of the lognormality of pollutant concentrations", J. Air Waste Manag. Assoc, 40, pp.1378~1383 (1990)[DOI]
- The Lognormal Distribution in Environmental Applications, "Environmental Protection Agency", EPA, ~, pp.EPA (1997), 600[DOI]
- W. Sohn, "An approach for determining reasonable sample sizes of MARSSIM final status surveys in decommissioning of nuclear facilities", Ann. Nucl. Energy, 131, pp.378~384 (2019)
- W. Sohn, "Theoretical comparative study of t tests and nonparametric tests for final status surveys of MARSSIM at decommissioning sites", Ann. Nucl. Energy, 135, pp.106945~ (2020)
- 손욱, "Monte Carlo simulation for verification of nonparametric tests used in final status surveys of MARSSIM at decommissioning of nuclear facilities", Nuclear Engineering and Technology, 53(5), pp.1664~1675 (2021), 한국원자력학회[DOI]
- Rancho Seco Final Status Survey Summary Report, IOSB outside Area Class 2 Survey Unit F8300142, "Rancho Seco Nuclear Generating Station", ~ (2017)
- Haddam Neck Plant Final Status Survey Final Report, Phase Ⅶ, "Connecticut Yankee Atomic Power Company", ~ (2007)
- Oracle And, "or its Affiliate", Oracle Crystal Ball Software User Manual, Version 11.2.4
- Data Quality Assessment: A Reviewer's Guide, "Environmental Protection Agency", EPA, ~, pp.EPA QA (2006), G-9R
- United States Nuclear Regulatory Commission, "Multi-Agency Radiological Laboratory Analytical Protocols Manual (MARLAP), Part II: Chapter 18-20, Appendix G (Volume III), NUREG-1576", USNRC, ~ (2004)
- H. Pham, "Springer Handbook of Engineering Statistics" (2006), Springer
- UQLab user manual e The INPUT module, Report # UQLab-V1.4-102, Chair of Risk, Safety and Uncertainty Quantification, "C. Lataniotis", ETH Zürich, ~ (2021)