초록

The Rare isotope Accelerator complex for ON-line experiments in Korea houses several accelerator complexes. Among them, the mSR facility will be initially equipped with a 600 MeV and 100 kW proton beam to generate surface muons, and will be upgraded to 400 kW with the same energy. Accelerated proton beams lose approximately 20% of the power at the target, and the remaining power is concentrated in the beam direction. Therefore, to ensure safe operation of the facility, concentrated protons must be distributed and absorbed at the beam dump. Additionally, effective dose levels must be lower than the legal standard, and the beam dumps used at 100 kW should be reused at 400 kW to minimize the generation of radioactive waste. In this study, we introduce a tailored method for designing beam dumps based on the characteristics of the mSR facility. To optimize the geometry, the absorbed power and effective dose were calculated using the MCNP6 code. The temperature and stress were determined using the ANSYS Mechanical code. Thus, the beam dump design consists of six structures when operated at 100 kW, and a 400 kW beam dump consisting of 24 structures was developed by reusing the 100 kW beam dump.

Abstract

The Rare isotope Accelerator complex for ON-line experiments in Korea houses several accelerator complexes. Among them, the mSR facility will be initially equipped with a 600 MeV and 100 kW proton beam to generate surface muons, and will be upgraded to 400 kW with the same energy. Accelerated proton beams lose approximately 20% of the power at the target, and the remaining power is concentrated in the beam direction. Therefore, to ensure safe operation of the facility, concentrated protons must be distributed and absorbed at the beam dump. Additionally, effective dose levels must be lower than the legal standard, and the beam dumps used at 100 kW should be reused at 400 kW to minimize the generation of radioactive waste. In this study, we introduce a tailored method for designing beam dumps based on the characteristics of the mSR facility. To optimize the geometry, the absorbed power and effective dose were calculated using the MCNP6 code. The temperature and stress were determined using the ANSYS Mechanical code. Thus, the beam dump design consists of six structures when operated at 100 kW, and a 400 kW beam dump consisting of 24 structures was developed by reusing the 100 kW beam dump.

참고문헌 (16)

  1. Y. J. Kim, "Current status of experimental facilities at RAON", Nucl. Instrum. Methods Phys. Res. Sect. B Beam Interact. Mater. Atoms, 463, pp.408~414 (2020)
  2. 박기홍, "Beam line design and beam transport calculation for the μSR facility at RAON", Nuclear Engineering and Technology, 53(10), pp.3344~3351 (2021), 한국원자력학회[DOI]
  3. K. Agari, "Development and construction of the beam dump for J-PARC hadron Hall", Proceedings of the 2nd International Particle Accelerator Conference (IPAC), pp.1608~1610 (2011)
  4. I.W. D'haeseleer, "Designing a Beam Dump for a 600 MeV Myrrha Linear Proton Accelerator", ~ (2011)
  5. Jiho Kim, "Design of a high energy proton beam dump for KOMAC", Nucl. Instrum. Methods Phys. Res. Sect. A Accel. Spectrom. Detect. Assoc. Equip, 562(2), pp.997~1000 (2006)
  6. Mikhail Avilov, "Thermal, mechanical and fluid flow aspects of the high power beam dump for FRIB", Nucl. Instrum. Methods Phys. Res. Sect. B Beam Interact. Mater. Atoms, 376, pp.24~ (2016)
  7. "MCNP: a general Monte Carlo code for neutron and photon transport" (2022)[URL]
  8. Jae Young Jeong, "Search Prospects for Axion-like Particles at Rare Nuclear Isotope Accelerator Facilities", 2022 arXiv preprint arXiv:2207.02223, ~ (2022)
  9. K. Agari, "Design and R&D status of NP-hall beam dump in J-PARC", Proceedings (2003)
  10. K. Agari, "Primary proton beam line at the J-PARC hadron experimental facility", Progress of Theoret. Experim. Phys, 2012(1) (2012)
  11. D. Chapman, "High Conductivity Copper for Electrical Engineering", Copper Development Association's resource library, 122, pp.1~32 (2016)
  12. J.R. Davis, "Copper and Copper Alloys" (2001), ASM international
  13. J-PARC high-intensity proton accelerator facilities, nuclear and particle physics facility construction group, hadron beam line subgroup, technical design report 3, "K. H. Tanaka", KEKInternal, ~, pp.2007-1 (2007)
  14. "ESTAR, PSTAR, and ASTAR: computer programs for calculating stopping-power and range tables for electrons, protons, and helium ions" (2017)[URL]
  15. "Tables of X-ray mass attenuation coefficients and mass energy-absorption coefficients 1 keV to 20 MeV for elements Z = 1 to 92 and 48 additional substances of dosimetric interest" (1995)[URL]
  16. T. L. Bergman, "Fundamentals of Heat and Mass Transfer" (2017), John Wiley & Sons

관련 논문AI추천

RF heating experiment to verify the design process of graphite target at the RAON μSR facility김용균, 김용현, 김재창, 박기홍, 이원준, 이주한, 장택진, 정재영한국원자력학회 · Nuclear Engineering and Technology2023 · 제55권 제10호Design and beam dynamics of a 400 kW D+ linear accelerator to generate fusion-like neutrons for breeding blanket tests in Korea곽동현, 김현욱, 문석호, 안무영, 정모세, 조승연, Cheon Yoo Lim, COSGUN EMRE한국원자력학회 · Nuclear Engineering and Technology2025 · 제57권 제9호몬테칼로 시뮬레이션을 활용한 양성자가속기 단기사용 시 구성품의 방사화 평가김정훈, 배상일대한방사선과학회 · Journal of Radiological Science and Technology2020 · 제43권 제5호의료용 사이클로트론 방사화폐기물 내 방사능 장기운전 포화 특성 및 감쇠 평가김광표, 유승범, 이신동, 정영선(사)한국방사선산업학회 · 방사선산업학회지2025 · 제19권 제4호Implementation of Fe ion irradiation and high-temperature target design at KAHIF for neutron damage simulation in fusion structural materials이기현, 이상빈, 이승현, 장대식, 허성렬한국원자력학회 · Nuclear Engineering and Technology2025 · 제57권 제12호고 에너지 양성자 가속기에서 생성되는 2차 방사선의 효과적인 차폐에 관한 연구김정훈, 배상일대한방사선과학회 · Journal of Radiological Science and Technology2020 · 제43권 제5호

이 간행물의 다른 논문 (39건)