임실 필봉문화촌 야외공연장의 음향성능 개선 및 평가
The Improvement and Evaluation of Acoustic Performance of Pilbong Cultural Village Outdoor Theater in Imsil
0
조회
0
다운로드
0
인용
0
참고문헌
키워드
초록
In 2013, Imsil Pilbong Culture Village installed a dome-shaped membrane structure off a ceiling of an outdoor performance hall in order to support performances under bad climate condition. However, sound energy during the performance is collected under the dome structure and bounced back to the stage, which produces mixed acoustic which causes a serious acoustic defects. So, in this study, in order to improve the acoustical performance of the outdoor performance hall in Korea Soriter, two sound performance improvements were proposed using sound simulation according to the installation suspension absorbers after identifying acoustic defects through field measurement. The results of study, the comparison between sound performance improvement test, sound pressure level (SPL500Hz) was 64.7dB at 69.0dB, the weighted sound level (SPLdB(A)) was 68.8dB(A) at 78.7dB(A), reverberation time (RT500Hz) was 1.28sec at 2.19sec, early decay time (EDT500Hz) was 1.48sec at 2.41sec, definition (D50,500Hz) was 52.9% at 29.8%, clarity (C80.500Hz) was 2.2dB at –1.0dB, and RASTI was 584.4%(“Fair”) at 51.1%(“Fair”) was evaluated.
Abstract
In 2013, Imsil Pilbong Culture Village installed a dome-shaped membrane structure off a ceiling of an outdoor performance hall in order to support performances under bad climate condition. However, sound energy during the performance is collected under the dome structure and bounced back to the stage, which produces mixed acoustic which causes a serious acoustic defects. So, in this study, in order to improve the acoustical performance of the outdoor performance hall in Korea Soriter, two sound performance improvements were proposed using sound simulation according to the installation suspension absorbers after identifying acoustic defects through field measurement. The results of study, the comparison between sound performance improvement test, sound pressure level (SPL500Hz) was 64.7dB at 69.0dB, the weighted sound level (SPLdB(A)) was 68.8dB(A) at 78.7dB(A), reverberation time (RT500Hz) was 1.28sec at 2.19sec, early decay time (EDT500Hz) was 1.48sec at 2.41sec, definition (D50,500Hz) was 52.9% at 29.8%, clarity (C80.500Hz) was 2.2dB at –1.0dB, and RASTI was 584.4%(“Fair”) at 51.1%(“Fair”) was evaluated.
참고문헌 (13)
- J. S. Kim, "Architectural sound", Sejin Co
- Y. E. Yoon, "The Improvement and Evaluation of Acoustic Performance of Liturgical Space at Haesung High School", J. Korean Soc. Mech. Technol, 23(2), pp.234~246 (2021)
- I. H. Hwang, "A study on the peculiarity of architectural acoustics of "Myeong dong catholic cathedral" of the Seoul Archdiocese", Master, pp.2007
- W. S. Byun, "Proposal of Standard Curve for Optimum Reverberation Time in Won-Buddhism Dharma Hall", Doctor, pp.2011
- K. Y. Han, "A Study on the Acoustics Characteristics of Won Buddhism Small Sanctums", Journal of the Architectural Institute of Korea, 25(1), pp.283~286 (2005)
- K. Y. Han, "A Study on the Acoustic Characteristics of The Ban-baek-nyeon Memorial hall of Won Buddhism", Journal of the Korea Society of Environmental Engineers, 721(728) (2004)
- K. Y. Han, "An Experimental Study on the Acoustic Characteristics of Won Buddhist Sanctums", Journal of the Architectural Institute of Korea, 23(2), pp.901~904 (2003)
- F. R. atson, "Acoustics of Buildings" (1948), John wiley &Sons, Inc
- Heinrich Kuttruff, "Room Acoustics" (1991), Elsevier Applied Science
- M. David Egan, "Concepts in Architectural Acoustics" (1972), McGRAW-Hill Book Company
- Yochi Ando, "Architectural Acoustics" (1998), Springer
- Leo Beranek, "Concert and Opera Halls" (1996), Acoustical Society of America
- Michael Barron, "Auditorium Acoustics and Architectural Design" (1993), E & FN SPON
