황룡강 유역 저수지군 하류하천 영향평가
Assessment of Flood Impact on Downstream of Reservoir Group at Hwangryong River Watershed
0
조회
0
다운로드
9
인용
0
참고문헌
키워드
초록
Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics,and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53%for 100yr and 200yr frequencies, respectively.
Abstract
Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics,and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53%for 100yr and 200yr frequencies, respectively.
참고문헌 (15)
- The four major restoration project master plan, "Cho, Y. J.", Ministry of Land, Transport and Maritime Affairs (in Korean), 144~162 (2009)
- Emergency action plan (Yeongsan_river), "Ministry for Food, Agriculture, Forestry and Fisheries(MFAFF)", ~ (2005)
- 한건연, "한강수계에서의 댐의 영향을 고려한 홍수추적", 한국수자원학회 논문집, 38(9), pp.747~760 (2005), 한국수자원학회
- 강민구, "Grey 모형을 이용한 다목적댐의 유입 홍수량과 하류 하천 홍수량 실시간 예측", 한국수자원학회 논문집, 42(1), pp.61~73 (2009), 한국수자원학회
- Koo, J. H., "A gis based integrated system for highway drainage design", 석사, pp.2001
- Annual statistics report of agricultural infrastructure project, "Korea Rural Community Corporation(KRC)", ~ (2010)
- "Korea Rural Community Corporation (KRC)"[URL]
- Lee, J. W., "An analysis of the effect of damming on flow duration characteristics of five major rivers in Korea", Journal of Korean Society of Civil Engineers, 18(3), pp.79~91 (1993)
- Noh, J. K., "Affecting water supply capacity followed by allocating flood control volume in heightening reservoir", Journal of Korean National Committee on Irrigation and Drainage, 17(2), pp.57~70 (2010)
- Rhee, K. H., "Optimization of reservoir operation of floodperiod using HEC-5 model", Korean Society of CivilEngineers Symposium, KSCE, pp.1501~1504 (2002)
- Sung, C. H., "A comparative study of unit hydrograph models using HEC-HMS at a small watershed", 석사, pp.2004
- U. S. Army Corps of Engineers(USACE), "HEC-5, Simulation of flood control and conservation systems user’s manual version 8.0", ~ (1998)
- U.S. Army Corps of Engineers (USACE), "Hydrologic modeling system HEC-HMS user’s manual version 3.5", ~ (2010)
- Yoon, Y. N., "An analysis on the variation of long-term runoff characteristics of basin before and after dam construction: Ⅰ. Estimation of NWS-PC model parameters using GIS", Journal of Korean Society of Civil Engineers, 18(11), pp.449~459 (1998)
- Yoon, Y. N., "An analysis on the variation of long-term runoff characteristics of basin before and after dam construction: Ⅱ. An analysis on the variation of long-term runoff characteristics of basin using model parameters estimation", Journal of Korean Society of Civil Engineers, 18(Ⅱ-5), pp.461~468 (1998)
