본문 바로가기
KERD
논문KCI 등재

Design and construction of the GK immersed tunnel of Busan-Geoje Fixed Link Project

0

조회

0

다운로드

0

인용

0

참고문헌

키워드

주제분류자원공학

초록

The GK immersed tunnel as a part of Busan-Geoje Fixed Link Project, is the first attempt in Korea. In spite of existing of many difficulties in construction like the absent of construction cases in Korea, the connection work under approximately 50 m below sea level and weak ground condition, etc., now eight caissons were installed successfully on the accurate position and we are going to install upto the twelfth caisson in this year. The purpose of this paper is to introduce design and construction conditions of the GK immersed tunnel to advise the tunnel designers who will handle the similar project.

Abstract

The GK immersed tunnel as a part of Busan-Geoje Fixed Link Project, is the first attempt in Korea. In spite of existing of many difficulties in construction like the absent of construction cases in Korea, the connection work under approximately 50 m below sea level and weak ground condition, etc., now eight caissons were installed successfully on the accurate position and we are going to install upto the twelfth caisson in this year. The purpose of this paper is to introduce design and construction conditions of the GK immersed tunnel to advise the tunnel designers who will handle the similar project.

참고문헌 (1)

  1. Busan-Geoje Fixed Link Detailed Design Report, "Daewoo E&C", ~

관련 논문AI추천

이 간행물의 다른 논문 (8건)