These days, shipbuilding companies are making an effort to adopt the IT technology in order to improve the production efficiency. One such effort is to utilize a planning and scheduling system to predict the production cost in advance. In this system, assessing the welding material quantity is an important factor. Unfortunately, obtaining the welding material quantity in the early design stage is extremely difficult because the detailed production information, which is essential in deriving the cost associated with welding, is normally available at a later stage. This paper aims at developing a computerized program that produces an index to estimate the welding material quantity in the early design stage. By using only three-dimensional geometric information, the program analyzes the production process and estimates the welding material quantity at any design or production stage when no production information is available. The results can be used for the planning and scheduling system.

Abstract

These days, shipbuilding companies are making an effort to adopt the IT technology in order to improve the production efficiency. One such effort is to utilize a planning and scheduling system to predict the production cost in advance. In this system, assessing the welding material quantity is an important factor. Unfortunately, obtaining the welding material quantity in the early design stage is extremely difficult because the detailed production information, which is essential in deriving the cost associated with welding, is normally available at a later stage. This paper aims at developing a computerized program that produces an index to estimate the welding material quantity in the early design stage. By using only three-dimensional geometric information, the program analyzes the production process and estimates the welding material quantity at any design or production stage when no production information is available. The results can be used for the planning and scheduling system.

참고문헌 (6)

  1. "BPVC Ⅸ" (2010)[URL]
  2. Cho, K.K., "Determination of assembly units and assembly sequences for block assembly in shipbuilding", Proceedings of the Korean Operations and Management Science Society Conference, Kyungsung University, pp.1~8 (1998)
  3. Lee, K.T, "A study on the development of welding material quantity estimation system for ship structures", Journal of Ocean Engineering and Technology, 12(4), pp.51~59 (1998)
  4. "OpenCASCADE technology documentation" (2016)[URL]
  5. 노명일, "선체 블록의 물량 정보 생성 및 블록 탑재 시뮬레이션에 관한 연구", 한국CDE학회 논문집, 11(2), pp.115~127 (2006), 한국CDE학회
  6. 유원선, "3차원 CAD 통합형 용접물량 산출 시스템에 관한 연구", 한국산학기술학회논문지, 14(7), pp.3184~3190 (2013), 한국산학기술학회[DOI]