본문 바로가기
KERD
논문KCI 등재

수상함 개발단계 정부품질관리를 위한 형상통제 이력 분석 연구 -OO Batch-1 사업을 중심으로-

Analysis of the Configuration Control History for Government Quality Control in the Development Stage of Surface Ships -Focusing on the OO Batch-Ⅰ Business-

0

조회

0

다운로드

0

인용

0

참고문헌

키워드

주제분류산업공학

초록

With the recent revision of the Defense Acquisitions Program Administration directive, the scope of quality assurance work for ships by the Defense Agency for Technology and Quality has expanded from mass production and operation maintenance to research and development. Thus far, the Defense Agency for Technology and Quality has focused on technical support and a review of items in the research and development stage of ship projects in accordance with relevant regulations. However, for future shipbuilding research and development projects, the Defense Agency for Technology and Quality plans to conduct quality assurance activities and issue inspection reports. Accordingly, a study was conducted to analyze the shape control history based on the most constructed isotype ship project to date, derive supplementation and improvement points based on the analyzed data, and analyze the requirement for government quality assurance activities at the development stage. In addition, we summarized matters that must be reviewed and reflected upon when performing quality control in the development stage.

Abstract

With the recent revision of the Defense Acquisitions Program Administration directive, the scope of quality assurance work for ships by the Defense Agency for Technology and Quality has expanded from mass production and operation maintenance to research and development. Thus far, the Defense Agency for Technology and Quality has focused on technical support and a review of items in the research and development stage of ship projects in accordance with relevant regulations. However, for future shipbuilding research and development projects, the Defense Agency for Technology and Quality plans to conduct quality assurance activities and issue inspection reports. Accordingly, a study was conducted to analyze the shape control history based on the most constructed isotype ship project to date, derive supplementation and improvement points based on the analyzed data, and analyze the requirement for government quality assurance activities at the development stage. In addition, we summarized matters that must be reviewed and reflected upon when performing quality control in the development stage.

참고문헌 (7)

  1. 손혜경, "군수품 표준관리제도 및 형상관리 운영체계 개선방안 연구", 한국산학기술학회논문지, 23(1), pp.182~190 (2022), 한국산학기술학회[DOI]
  2. Defense Acquisition Program Administration, "Standardization Work Regulations", DAPA, ~ (2021)
  3. 정현우, "군수품 형상통제업무 발전방안에 관한 연구", 한국산학기술학회논문지, 21(6), pp.70~77 (2020), 한국산학기술학회[DOI]
  4. 오진우, "체계업체별 무기체계 소프트웨어 기술변경 원인분석을 통한 품질관리 강화 방안 연구", 국방품질연구논집(JDQS), 4(2), pp.2~8 (2022), 국방기술품질원[DOI]
  5. 최상민, "수상함 시운전평가서 국방표준화 및 효과성 분석 연구", 국방품질연구논집(JDQS), 3(2), pp.24~32 (2021), 국방기술품질원[DOI]
  6. "MIL-HDBK-61B, Configuration Management Guidance", ~ (2020)
  7. "Configuration Management (CM) Policy and Guidance", ~ (2004)

관련 논문AI추천

이 간행물의 다른 논문 (26건)