Research on the surface settlement and structural force during the construction of the combined structure
0
조회
0
다운로드
0
인용
0
참고문헌
키워드
초록
The pipe screen structure proposed in this paper is a closed underground steel pipe and reinforced concrete combinedstructure including 20 steel pipes. The pipe screen - structure method (PSM) mainly includes three construction stages suchas steel pipe jacking, steel pipe cutting and concrete pouring, and earth excavation. The surface settlement and structural stresscharacteristics in the pipe screen structure method's construction process are investigated in this paper using numericalcalculations and field tests. The research results show that the pipe curtain structure method can effectively reduce the surfacesubsidence caused by construction, and the settlement induced in the first stage is the largest, followed by the second stage. The buried pipe curtain structure bears less load according to the measured data. The stress concentration at the connectionpositions between the steel pipe and the steel plate is noticeable during the steel pipe cutting process. The steel pipe supportcolumn mainly bears the pressure, and its bending moment is small. The main reinforced concrete structure is less stressed,and the structural parameters can be further optimized.
Abstract
The pipe screen structure proposed in this paper is a closed underground steel pipe and reinforced concrete combinedstructure including 20 steel pipes. The pipe screen - structure method (PSM) mainly includes three construction stages suchas steel pipe jacking, steel pipe cutting and concrete pouring, and earth excavation. The surface settlement and structural stresscharacteristics in the pipe screen structure method's construction process are investigated in this paper using numericalcalculations and field tests. The research results show that the pipe curtain structure method can effectively reduce the surfacesubsidence caused by construction, and the settlement induced in the first stage is the largest, followed by the second stage. The buried pipe curtain structure bears less load according to the measured data. The stress concentration at the connectionpositions between the steel pipe and the steel plate is noticeable during the steel pipe cutting process. The steel pipe supportcolumn mainly bears the pressure, and its bending moment is small. The main reinforced concrete structure is less stressed,and the structural parameters can be further optimized.
참고문헌 (16)
- G. Musso, , Civ. Eng, 49, pp.79~82 (1979)
- E. Hemerijckx, , Tunnel. Int, 15, pp.13~16 (1983)
- I. J. Park, , Tunn. Undergr. Sp. Tech, 21, pp.394~398 (2006)
- C.W. Kwak, "The 4th Dimension of Metropolises", pp.513~518 (2007)
- S.K. Chang, , Proceedings of the 12th International Conference of the Associated Research Centers for Urban Underground Space, pp.21~ (2009)
- S. Z. Chen, , Cons. Tech, 41, pp.41~49 (2012)
- Y. S. Li, , Rock Soil Mech, 32, pp.3701~3707 (2011)
- X. M. Han, , Railway Standard Design, 65, pp.134~140 (2021)
- X. M. Han, , Tunnel Constr, 40, pp.170~178 (2020)
- X. B. Ji, , Tunn. Undergr. Space Technol, 90, pp.119~130 (2019)
- X. B. Ji, , Underground Space, 4, pp.277~288 (2019)
- Y. Xian, , Tunn. Undergr. Space Technol, 72, pp.210~217 (2018)
- X. Yang, , Shenyang Univ. Technol, 34, pp.469~473 (2012)
- H. S. Lee, , J. Ceram Process Res, 20, pp.100~108 (2019)
- Kwang Bo Shim, "Cementitiuous materials for crack self-healing concrete", Journal of Ceramic Processing Research, 16, pp.1~13 (2015), 청정에너지연구소[DOI]
- H. X. D. Lee, , Cement and Concrete Research, 79, pp.194~208 (2016)