The completeness appraisal of software is performed in various forms, such as assessing the completion level in the development process, calculating the defect rate, estimating the development cost, and calculating the redevelopment cost. Along with this, the problem that is often dealt with is estimation of the development time. Even in a dispute over completeness due to delays in software development, issues of calculating an appropriate development time required to develop a delivery software or a development time required for change requests are often included in the appraisal request. In this paper, we introduce the procedure and method for estimating the appropriate project time of software development so that the appraiser can be applied to the appraisal work for determining the completeness. The method is based on the manual for calculating the appropriate project period of software development project.

Abstract

The completeness appraisal of software is performed in various forms, such as assessing the completion level in the development process, calculating the defect rate, estimating the development cost, and calculating the redevelopment cost. Along with this, the problem that is often dealt with is estimation of the development time. Even in a dispute over completeness due to delays in software development, issues of calculating an appropriate development time required to develop a delivery software or a development time required for change requests are often included in the appraisal request. In this paper, we introduce the procedure and method for estimating the appropriate project time of software development so that the appraiser can be applied to the appraisal work for determining the completeness. The method is based on the manual for calculating the appropriate project period of software development project.

참고문헌 (10)

  1. 권기태, "컴퓨터 프로그램 완성도 감정 개요", 한국소프트웨어감정평가학회 논문지, 11(2), pp.1~8 (2015), 한국소프트웨어감정평가학회
  2. 권기태, "개발비 감정 시 SW사업 대가산정 가이드 적용 문제점", 한국소프트웨어감정평가학회 논문지, 12(1), pp.11~19 (2016), 한국소프트웨어감정평가학회
  3. "Collection of cases of disputes such as SW copyright, vol. 1" (2011)[URL]
  4. "Manual for Calculating the Appropriate Project Period of Software Development Project" (2016)[URL]
  5. "SW Business Price Estimation Guidelines (2019Revision)" (2019)[URL]
  6. "International Standards-Based Function Point Calculation Guidelines" (2014)[URL]
  7. S. Oligny, "An Empirical Assessment of Project Duration Models in Software Engineering", Proceedings of the 8th European Software Control and Metrics Conference (ESCOM'97) (1997)
  8. S. Oligny, "Exploring the Relation Between Effort and Duration in Software Engineering Projects", Proceedings of 16th World Computer Congress 2000 (WCC 2000), pp.175~178 (2000)
  9. BA Kitchenham, "Empirical studies of assumptions that underlie software cost-estimation models", Information and Software Technology, 34(4), pp.211~218 (1992), Elsevier BV[DOI]
  10. O. K. Harfoushi, "Software project scheduling techniques : A comparison study", International Review on Computers and Software, 8(3), pp.876~880 (2013)