서귀포 크루즈터미널 CIQ시설 규모산정에 관한 연구

A Study on the Size Computation of Seogwipo Cruise Terminal CIQ Facilities

1

조회

0

다운로드

1

인용

0

참고문헌

키워드

초록

This research studies the adequate size standard of Seogwipo cruise terminal CIQ facility that is scheduled to be built around Gangjeong harbor area in Seogwipo-city. In order to respond to the highly increasing number of passenger cruise ships compared to Seogwipo cruise terminal design in 2010, the adequate size standard of Seogwipo cruise terminal CIQ facility was examined for passenger service level grade. Based on size computation elements such as the number of passengers of cruise ships with the largest size of port entry, ship landing rate, passenger processing ratio, and surge factor, the CIQ facility size for each service level grade was reviewed. As a result, the area of 2,971m2 (A grade), 2,409 m2 (B grade), and 2,088 m2 (C grade) were computed. This showed that the area of B grade was about 82% and C grade 70% compared to the area of A grade. The CIQ facility size computed for each service level grade in this research was analyzed that its area needed to be increased by 322% at least and 458% at most, compared to the CIQ facility area of 649m2 of the existing design (2010). In order to respond to the increasing number of cruise passengers, provide high-level passenger service, and improve the international image of Jeju, Seogwipo cruise terminal should secure the size that is equal to or higher than the B grade of service level.

Abstract

This research studies the adequate size standard of Seogwipo cruise terminal CIQ facility that is scheduled to be built around Gangjeong harbor area in Seogwipo-city. In order to respond to the highly increasing number of passenger cruise ships compared to Seogwipo cruise terminal design in 2010, the adequate size standard of Seogwipo cruise terminal CIQ facility was examined for passenger service level grade. Based on size computation elements such as the number of passengers of cruise ships with the largest size of port entry, ship landing rate, passenger processing ratio, and surge factor, the CIQ facility size for each service level grade was reviewed. As a result, the area of 2,971m2 (A grade), 2,409 m2 (B grade), and 2,088 m2 (C grade) were computed. This showed that the area of B grade was about 82% and C grade 70% compared to the area of A grade. The CIQ facility size computed for each service level grade in this research was analyzed that its area needed to be increased by 322% at least and 458% at most, compared to the CIQ facility area of 649m2 of the existing design (2010). In order to respond to the increasing number of cruise passengers, provide high-level passenger service, and improve the international image of Jeju, Seogwipo cruise terminal should secure the size that is equal to or higher than the B grade of service level.

참고문헌 (13)

  1. 포항공항 설계보고서, "건설교통부 부산지방항공청", ~ (1999)
  2. 무안국제공항 설계보고서, "건설교통부 서울지방항공청", ~ (1999)
  3. 류기환, "크루즈 여행 실무론" (2010), 백산출판사
  4. 박정근, "공항 여객터미널 규모와 평면구성 요소에 관한 연구", 박사, 건축공학, pp.2010
  5. 인천국제공항공사, "인천국제공항 여객터미널 신축공사; 소요면적계산서", ~ (1998)
  6. 인천국제공항공사, "인천국제공항 2단계건설 건축시설 설계용역; 소요면적계산서", ~ (2004)
  7. 서귀포 크루즈터미널 및 친수공원조성 기본 및 실시설계용역 보고서, "제주특별자치도", ~ (2013)
  8. "제주특별자치도 홈페이지"[URL]
  9. 최순환, "울산항 크루즈 전용터미널 계획에 관한 연구", 석사, 건축설계전공, pp.2012
  10. 최훈호, "크루즈 터미널의 규모산정 요소 설정에 관한 연구", 석사, 건축학, pp.2011
  11. The Hague, "Scheveningen Cruise Port-Cruise Program and Trariff Analysis", Bermello Ajamil & Partner. Inc, 2008
  12. IATA, "Airport Development Reference Manual", ~ (2004)
  13. U.S Customs and Border Protection, "Design Standards for Cruise Ship Passenger Processing Facilities", ~ (2006)

관련 논문AI추천

이 간행물의 다른 논문 (9건)