국제건설계약에서 시공자 책임제한법리-FIDIC 계약조건을 중심으로-
Contractor’s Limit of Liability under the International Construction Contract
0
조회
0
다운로드
6
인용
0
참고문헌
키워드
초록
International standard forms of construction contract such as FIDIC, ENAA and ICC are intended to be used not in a specific jurisdiction but in a worldwide scale. In principle, therefore, such standard contracts must use neutral terminologies which practitioners from both civil law and common law countries can have common understanding about. Unfortunately, however it seems not possible to achievesuch a target in reality. In the article, the author will be addressing the contractor’s limit of liability under the well-known international standard form of construction contract, FIDIC, comparing the relevant clauses of ENAA model forms when it appears necessary. The contractor’s limit of liability mainly comprises the exclusion of consequential damages or indirect damages from the contractor’s liability and putting a ceiling on the contractor’s total liability, including respectively putting a ceiling on the delay liquidated damages and performance liquidated damages. This should be a narrow way one understand the contractor’s limit of liability. If one understands the concept of the contractor’s limit of liability in a broad way other clauses such as force majeure, defects liability, transfer of risks or unforeseen physical conditions can be regarded as the mechanism to limit the contractor’s liability as well. FIDIC is based on the International Civil Engineers form of United Kingdom, so it can be said that FIDIC is the contract form which has a common law origin. The common law lawyers are quite familiar with the concepts of consequential damages and indirect damages. There are some countries among civil law countrieswhich do not have the concept of consequential damages or indirect damages. What would happen if the construction contract which has adopted FIDIC provides the governing law as the law of the country which does not recognize consequential damages or indirect damages? In addition, there is a striking difference between common law and civil law with respect to the liquidated damages. Under the common law, it is not allowed to impose a penalty on the contractor as liquidated damages. It should be a reasonable pre-estimate of possible damages in case of delay attributable to the contractor, while the courts in civil law countries usually have the discretion to reduce liquidated damages if the courts determine it to be unduly excessive compared to actual damages. Under FIDIC Yellow and Silver Book, the contractor will be released from delay liquidated damages once it satisfies the minimum level of performance criteria at the Test on Completion. However, the performance liquidated damages is to be determined on the Test after Completion which occurs sometime after Test on Completion. This is quite different from usual practice in the EPC Turnkey projects that performance liquidated damages is determined at Test on Completion as well. The logic of FIDIC behind this is that there is too much involvement by the owner during the performance test stage, so it would not be fair and reasonable to impose delay damages on the contractor during the performance test stage. It is a big negotiation point between the contractor and the owner to determine which kinds of liabilities are included when calculating the ceiling of the contractor’s total liabilities. For example, the contractor’s defect liability is usually included into the contractor’s total liabilities cap, while financial institutions are reluctant to include defect liabilities into the contractor’s total liabilities cap. The study on the international standard form of construction contract requires inevitably a comparative research between common law and civil law. In addition, even the countries which belong to the same legal system differ from country to country. There may be some mistakes in my article due to difficulties inherent in such a comparative legal research. The author expects subsequent studies on the topic to rectify any possible error and mistake in the article.
Abstract
International standard forms of construction contract such as FIDIC, ENAA and ICC are intended to be used not in a specific jurisdiction but in a worldwide scale. In principle, therefore, such standard contracts must use neutral terminologies which practitioners from both civil law and common law countries can have common understanding about. Unfortunately, however it seems not possible to achievesuch a target in reality. In the article, the author will be addressing the contractor’s limit of liability under the well-known international standard form of construction contract, FIDIC, comparing the relevant clauses of ENAA model forms when it appears necessary. The contractor’s limit of liability mainly comprises the exclusion of consequential damages or indirect damages from the contractor’s liability and putting a ceiling on the contractor’s total liability, including respectively putting a ceiling on the delay liquidated damages and performance liquidated damages. This should be a narrow way one understand the contractor’s limit of liability. If one understands the concept of the contractor’s limit of liability in a broad way other clauses such as force majeure, defects liability, transfer of risks or unforeseen physical conditions can be regarded as the mechanism to limit the contractor’s liability as well. FIDIC is based on the International Civil Engineers form of United Kingdom, so it can be said that FIDIC is the contract form which has a common law origin. The common law lawyers are quite familiar with the concepts of consequential damages and indirect damages. There are some countries among civil law countrieswhich do not have the concept of consequential damages or indirect damages. What would happen if the construction contract which has adopted FIDIC provides the governing law as the law of the country which does not recognize consequential damages or indirect damages? In addition, there is a striking difference between common law and civil law with respect to the liquidated damages. Under the common law, it is not allowed to impose a penalty on the contractor as liquidated damages. It should be a reasonable pre-estimate of possible damages in case of delay attributable to the contractor, while the courts in civil law countries usually have the discretion to reduce liquidated damages if the courts determine it to be unduly excessive compared to actual damages. Under FIDIC Yellow and Silver Book, the contractor will be released from delay liquidated damages once it satisfies the minimum level of performance criteria at the Test on Completion. However, the performance liquidated damages is to be determined on the Test after Completion which occurs sometime after Test on Completion. This is quite different from usual practice in the EPC Turnkey projects that performance liquidated damages is determined at Test on Completion as well. The logic of FIDIC behind this is that there is too much involvement by the owner during the performance test stage, so it would not be fair and reasonable to impose delay damages on the contractor during the performance test stage. It is a big negotiation point between the contractor and the owner to determine which kinds of liabilities are included when calculating the ceiling of the contractor’s total liabilities. For example, the contractor’s defect liability is usually included into the contractor’s total liabilities cap, while financial institutions are reluctant to include defect liabilities into the contractor’s total liabilities cap. The study on the international standard form of construction contract requires inevitably a comparative research between common law and civil law. In addition, even the countries which belong to the same legal system differ from country to country. There may be some mistakes in my article due to difficulties inherent in such a comparative legal research. The author expects subsequent studies on the topic to rectify any possible error and mistake in the article.
참고문헌 (35)
- 현학봉, "계약관리와 클레임-FIDIC 1999년 신판기준" (2012), Cplus International
- 권대욱, "개방시대의 국제건설계약-FIDIC 국제표준계약조건 해설을 중심으로" (1997), 주식회사 두비
- 석광현, "국제물품매매계약의 법리" (2010), 박영사
- 오원석, "UNIDROIT 국제상사계약원칙 2004", ~ (2006)
- 명순구, "프랑스 민법전(Code Civil Français)" (2004), 법문사
- 양삼승, "주석민법⋅채권총칙1", ~ (2000)
- 양창수, "독일민법전" (2002), 박영사
- 구욱서, "주석민법⋅채권각칙4", ~ (2000)
- Axel-Volkmar Jaeger, "FIDIC-A Guide for Practitioners" (2010), Springer
- Joseph A. Huse, "Understanding and Negotiating Turnkey and EPC Contracts" (2010), Sweet &Maxwell
- Ellis Baker, "FIDIC Contracts: Law and Practice" (2009), Informa
- Nael G. Bunni, "The FIDIC Forms of Contract" (2008), Blackwell Publishing
- Robert Knutson, "FIDIC An Analysis of International Construction Contracts" (2005), Kluwer Law International and International Bar Association
- "The FIDIC Contracts Guide", First Edition,FIDIC, ~ (2000)
- Ole Lando, "Principles of European Contract Law Parts I and II Combined and Revised" (2000), Kluwer Law International
- E.C. Corbett, "A Practical Legal Guide-A Commentary on the International Construction Contract" (1991), Sweet & Maxwell
- G.H. Treitel, "Remedies for Breach of Contract-A Comparative Account" (1991), Clarendon
- G.D. Schaber, "Contracts in a Nutshell" (1990), West Pub
- 박영복, "연성법(soft law)으로서의 「Unidroit의 국제상사계약원칙」 ― 그 법체계상의 지위와 기능을 중심으로 ―", 법철학연구, 12(1), pp.223~254 (2009), 한국법철학회
- 김승현, "프로젝트 파이낸스와 EPC", Turnkey 契約, 2004, pp.(58), 125~170[DOI]
- 吳元奭, "國際物品賣買契約에서 ‘Liquidated Damage Clause’(LD 條項)의 有效性과 實務的 適用에 관한 연구", 무역상무연구, 17, pp.3~92 (2002), 한국무역상무학회
- 崔彰烈, "손해배상액의 예정과 위약벌에 관한 연구", 박사, 민사법, pp.1999
- 임건면, "손해배상액의 예정과 위약벌에 관한 비교법적 연구, 경암홍천룡 교수 화갑기념논문집" (1997)
- 李相泰, "建築受給人의 瑕疵擔保責任에 관한 硏究", 박사, 법학, pp.1991
- Marwan Sakr, "Turnkey Contracting under the ICC Model Contract for Major Projects: A Middle Eastern Law Perspective", ICLR Vol, 26 (2009)
- Matthew Bell, "Will the Silver Book Become the World Bank’s New Gold Standard? The International relationship between the World Bank’s Infrastructure Procurement Policies and FIDIC’s and Construction Contracts", ICLR, 21 (2004)
- Thomas Siegenthaler, "“Indirect and Consequential Loss Clauses Under Swiss Law", ICLR, 20 (2003)
- Hiromi Hoshi, "ENAA Model Form of Contract for Power Plant Construction", ICLR, 14 (1997)
- Peter Megens, "Construction Risk and Project Finance", ICLR, 14 (1997)
- DR JJ Goudsmit, "The EIC (European International Contractors) Turnkey Contract (Conditions for Design and Construction Projects)", ICLR, 12 (1995)
- N. Wakame, "An Overview of Major Issues on ENAA Model Form International Contract Process Plant Construction, 1992 Edition", ICLR, 12 (1995)
- Tore Wiwen-Nilsson, "A Brief Review of the 1992 Edition of the ENAA Model Form- International Contract for Process Plant Construction (Turnkey Lumpsum Basis)", ICLR, 11 (1994)
- Nicholas Gould, "Comments on the ENAA Model Form International Contract for Process Plant Construction (Revised 1992)", ICLR, 11 (1994)
- KunihikoFuruya, "ENAA Revised Model Form of Contract (1992) Edition", ICLR, 10 (1993)
- Gordon L Jaynes, "Turnkey Contracts: Japan’s Model Forms", ICLR, 10 (1993)
