국가 산학연 협력 연구개발과제의 목표관리를 위한 정보시스템 효과 분석
The Design & Effect Analysis of Project Objective Management Information System for National R&D cooperated by Industries, Universities and Government-supported research institutes
0
조회
0
다운로드
1
인용
0
참고문헌
키워드
초록
We studied how to achieve successful implementation of massive research nand development projects requiring collaboration among industries, universities and government-supported research institute. We have set up an engineering process innovation model to be deemed most adequately for all practical purposes, relying on the theoretical studies on the merits and analysis of the effect of the information system based on Milestone Management, Work Breakdown Structures and Web, which is known to be effective for research project (schedule) management and the objective management, and implemented a real-world web-based project objective management system. After a review of various R & D Project Schedule Management methods, we found that this information system was very compatible with project objective management. This project objective management information system carries out research and development projects effectively and efficiently, getting together in cyber-space and sharing information, and has been equipped with an Early Warning Subsystem to allow for pre-analysis and timely response to potential problems arising from the course of the project. The system also contains an Executive Information System that in real time, automatically provides the management information required by managers with the rate of project progress (achievement, fulfillment and delay). Lastly, actual progress can be cross-checked through both on-line objective management on the web-based information system and design review meeting held on site, to improve the efficiency and validity of the information system. Moreover, overall effect was analyzed through questionnaires on how well the system and generated information meet requirements and on the ultimate impact of the system upon objective management and communication. The questionnaire on the system effect revealed that the information system was useful to objective management and communication, and that the quality of the system was more than acceptable as well.
Abstract
We studied how to achieve successful implementation of massive research nand development projects requiring collaboration among industries, universities and government-supported research institute. We have set up an engineering process innovation model to be deemed most adequately for all practical purposes, relying on the theoretical studies on the merits and analysis of the effect of the information system based on Milestone Management, Work Breakdown Structures and Web, which is known to be effective for research project (schedule) management and the objective management, and implemented a real-world web-based project objective management system. After a review of various R & D Project Schedule Management methods, we found that this information system was very compatible with project objective management. This project objective management information system carries out research and development projects effectively and efficiently, getting together in cyber-space and sharing information, and has been equipped with an Early Warning Subsystem to allow for pre-analysis and timely response to potential problems arising from the course of the project. The system also contains an Executive Information System that in real time, automatically provides the management information required by managers with the rate of project progress (achievement, fulfillment and delay). Lastly, actual progress can be cross-checked through both on-line objective management on the web-based information system and design review meeting held on site, to improve the efficiency and validity of the information system. Moreover, overall effect was analyzed through questionnaires on how well the system and generated information meet requirements and on the ultimate impact of the system upon objective management and communication. The questionnaire on the system effect revealed that the information system was useful to objective management and communication, and that the quality of the system was more than acceptable as well.
참고문헌 (14)
- 김경원, "Stage-Gate 프로세스를 통한 연구 생산성 향상", 기술과 경영, pp.46~49 (2004), 한국산업기술진흥 협회
- 김정훈, "목표관리를 통한 연구 생산성 향상", 석사, pp.1994
- 배종태, "R & D 프로젝트관리 및 평가", 2006년도 R&D 프로젝트리더 양성과정, pp.24~ (2006), 한국산 업기술진흥협회
- 손권중, "국내 기업 연구직 사원의 직무 만족 및 전직 요인 분석과 생애 경력 발전모형", 석사, pp.1989
- 테라급나노소자개발사업 과제(목표)관리 System 구축, "이조원", 과학기술부 특정 연구개발사업 연구보고서, ~ (2003)
- 정준영, "우리나라 기업부설연구소의 연구개발과제 관리행태에 관한 연구", 석사, pp.1998
- 최점기, "정보화지원사업의 인과적 평가모형개발에 관한 실증적 연구", 박사, pp.2005
- 테라급나노소자개발사업단, "과제관리 시스템 교육자료" (2001)
- Allen T.J., "Communication Networks in R&D laboratories", R&D Management, 1, pp.14~21 (1970)
- DeLone, W. H., "Information Systems Success: The Quest for the Dependent Variable", Information Systems Research, 3(1), pp.60~95 (1992)
- DeLone, W. H., "The DeLone and McLean-Model of Information Systems Success: A Ten-Year Update", Journal of Management Information Systems, 19(4), pp.9~30 (2003)
- Liberatore, M. J., "Synthesizing R&D Planning and Business Strategy : Some Preliminary Findings", R&D Mnangement, 13(4), pp.207~218 (1983)
- Martin Michal,J.C., "Managing Innovation and Entrepreneurship in Technology Based Firms", pp.255~256 (1994), Wiley-IEEE
- Smith, P. G., "Developing Products in Half The Time", pp.145~146 (1995), VNR
