When disposing of radioactive waste, the treatment must be preceded to reduce the amountof radioactive waste and retain the safety of disposal. Currently, many nuclear power plants in Koreaare about to be shut-down, and accordingly, large amounts of low- and intermediate- level waste areexpected to be generated due to decommissioning in the future. Because there are limits to treating allthose wastes through nuclear power plant radioactive waste management system, it is necessary toestablish an on-site radioactive waste treatment facility as an alternative. To establish on-site treatmentfacility, the investigation of on-site treatment process and related equipment must be preceded. Thepurpose of this study is to investigate the status of on-site radioactive waste treatment facilities indomestic and foreign nuclear facility. We selected on-site radioactive waste treatment facilities ofGermany’s Greifswald Nuclear Power Plant, Sweden’s Oskarshamn Nuclear Power Plant, Finland’sLoviisa Nuclear Power Plant, Japan’s Nuclear Science Research Institute, and the Korea Atomic EnergyResearch Institute as facilities to be investigated. As a result of analyzing the major treatment processesof on-site treatment facilities at domestic and foreign nuclear facilities, there were ten major treatmentprocesses in the facility, including measurement for clearance, compression, cutting, decontamination,incineration, melting, vaporization, and evaporation. Germany’s Greifswald nuclear power plant,Sweden’s Oskarshamn nuclear power plant, and Finland’s Loviisa nuclear power plant consideredtreatment of operational and decommissioning waste. In the case of decommissioning is beingperformed, decontamination treatment is being carried out. On-site treatment facilities of all nuclearpower plant were not considering evaporation, and that treatment process was performed only at theJapan Nuclear Science Research Institute and the Korea Atomic Energy Research Institute. As a resultof the analysis of the equipment utilized in the treatment facility, equipment for treatment is differentdepending on the treatment process of radioactive waste. In the case of cutting and decontamination,relatively flexible treatment equipment could be selected. Because the matrix for solidification isdetermined differently according to the characteristics of radioactive waste, the solidification treatmentequipment utilized by each treatment facility were different. The results of this study can be used as basicdata when establishing on-site radioactive waste treatment facility in the future.

Abstract

When disposing of radioactive waste, the treatment must be preceded to reduce the amountof radioactive waste and retain the safety of disposal. Currently, many nuclear power plants in Koreaare about to be shut-down, and accordingly, large amounts of low- and intermediate- level waste areexpected to be generated due to decommissioning in the future. Because there are limits to treating allthose wastes through nuclear power plant radioactive waste management system, it is necessary toestablish an on-site radioactive waste treatment facility as an alternative. To establish on-site treatmentfacility, the investigation of on-site treatment process and related equipment must be preceded. Thepurpose of this study is to investigate the status of on-site radioactive waste treatment facilities indomestic and foreign nuclear facility. We selected on-site radioactive waste treatment facilities ofGermany’s Greifswald Nuclear Power Plant, Sweden’s Oskarshamn Nuclear Power Plant, Finland’sLoviisa Nuclear Power Plant, Japan’s Nuclear Science Research Institute, and the Korea Atomic EnergyResearch Institute as facilities to be investigated. As a result of analyzing the major treatment processesof on-site treatment facilities at domestic and foreign nuclear facilities, there were ten major treatmentprocesses in the facility, including measurement for clearance, compression, cutting, decontamination,incineration, melting, vaporization, and evaporation. Germany’s Greifswald nuclear power plant,Sweden’s Oskarshamn nuclear power plant, and Finland’s Loviisa nuclear power plant consideredtreatment of operational and decommissioning waste. In the case of decommissioning is beingperformed, decontamination treatment is being carried out. On-site treatment facilities of all nuclearpower plant were not considering evaporation, and that treatment process was performed only at theJapan Nuclear Science Research Institute and the Korea Atomic Energy Research Institute. As a resultof the analysis of the equipment utilized in the treatment facility, equipment for treatment is differentdepending on the treatment process of radioactive waste. In the case of cutting and decontamination,relatively flexible treatment equipment could be selected. Because the matrix for solidification isdetermined differently according to the characteristics of radioactive waste, the solidification treatmentequipment utilized by each treatment facility were different. The results of this study can be used as basicdata when establishing on-site radioactive waste treatment facility in the future.

참고문헌 (38)

  1. MOTIE, "Korean 2nd Basic Plan for the Management of LILW" (2020)
  2. KORAD., "Implementation Plan for the Management of LILW in 2020" (2020)
  3. Korean Seventh National Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, "KINS", ~, pp.KINS (2020), AG-020
  4. IAEA, "Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. INFCIRC", 546, 1997
  5. Predisposal Management of Radioactive Waste from Nuclear Power Plants and Research Reactors, "IAEA", ~, pp.No. SSG-40 (2016)
  6. Innovative waste treatment and conditioning technologies at nuclear power plants, "IAEA", ~, pp.IAEA-TECDOC-1504 (2006)
  7. BfS, "Decommissioning in Germany; Greifswald NPPs" (2011)
  8. Westinghouse, "Decommissioning Planning for Forsmark and Oskarshamn NPPs" (2010)
  9. Fortum, "Integration of Safety, Reliability and Technology based on experience of nuclear waste management in Finland" (2018)
  10. Fortum, "Loviisa power plant; Our environment 2019", ~ (2019)
  11. Son H-D, "Matters to be prepared by enterprises for the decommissioning of Gori Unit 1", KAIF, 37(12), pp.73~78 (2017)
  12. Choe Y-G, "Kori Unit 1 Decommissioning Project Promotion Plan", KAIF, 37(12), pp.40~49 (2017)
  13. Current and future of nuclear power plant decommissioning waste treatment technology, "Song J-S", Korea Environmental Industry & Technology Institute, ~, pp.Konetic Report 2016-134 (2016)
  14. Baek S-G, "Cutting Robot for the Nuclear Plant Decommissioning", Proceedings of the Korean Society of Mechanical Engineers Spring and Autumn Conference 2015, pp.4131~4136 (2015)
  15. Yoon H, "Plasma Torch System for Radioactive Waste Treatment in Decommissioning", Proceedings of the Korean Society for Fluid Machinery Summer Conference, pp.407~408 (2020)
  16. 정현준, "원전 해체폐기물의 효과적인 부피 감용을 위한 이동형 압축 설비 개념설계 연구", 방사선산업학회지, 14(4), pp.441~446 (2020), (사)한국방사선산업학회[DOI]
  17. The management of Radioactive Waste Treatment facility, "KAERI", ~, pp.KAERI-MR-247 (1994), 94
  18. The management of Radioactive Waste Treatment facility, "KAERI", ~, pp.KAERI (2001), MR-365[DOI]
  19. Construction and Operation of Practical Scale Decommissioning Waste Treatment Facilities, "KAERI", ~, pp.KAERI (2017), RR- 4330[DOI]
  20. Radioactive Waste Management Profiles. a Compilation of Data from the Net Enabled Waste Management Database (NEWMDB), "IAEA", ~, pp.IAEA (2007), WMDB[DOI]
  21. Radioactive Waste Management Self Study, "NRC", ~, pp.ML12151A430-0879-H202S (2012)
  22. Germany’s 8th National Report under the Joint Convention on Nuclear Safety, "BMU", ~ (2020)
  23. Germany’s 7th National Report under the Joint Convention on the Safety of Spent Fuel Management and on the Radioactive Waste Managemen, "BMU", ~ (2021)
  24. EWN, "The Greifswald Decommissioning Project" (2011)
  25. Hartmann B, "The Role of the World’s Largest Interim Storage for Waste and Fuel within the Decom Project of 6 WWER Reactors in Greifswald and Rheinbsberg" (1999)
  26. Thurow E, "Radiological Charcterisation - the Greifswald NPP approach" (2012)
  27. Finnish 8th National Report under the Joint Convention on Nuclear Safety, "Naturvårdsverket", ~ (2019)
  28. Finnish 7th National Report under the Joint Convention on the Safety of Spent Fuel Management and on the Radioactive Waste Management, "Naturvårdsverket", ~ (2020)
  29. Decommissioning Planning for Nuclear Units at the Oskarshamn Site, "Rannemalm T", ~ (2016)
  30. Decommissioning Study of Oskarshamn NPP, "SKB", ~, pp.R-13-04 (2013)
  31. SSM, "General data in accordance with the requirements in article 37 of the Euratom Treaty; Dismantling of the nuclear reactors Oskarshamn 1 and 2 in Sweden" (2017)
  32. Finnish 8th National Report under the Joint Convention on Nuclear Safety, "STUK", ~ (2019)
  33. Finnish 7th National Report under the Joint Convention on the Safety of Spent Fuel Management and on the Radioactive Waste Management, "STUK", ~ (2020)
  34. Fortum, "Loviisa power plant; Our environment 2020", ~ (2020)
  35. "Treatment of Radioactive Waste"[URL]
  36. ANNUAL REPORT 2021, "Studsvik", ~ (2021)
  37. Studsvik, "Waste Volume Reduction by Studsvik Nuclear AB" (2010)
  38. Studsvik, "Options for Steam Generator Decommissioning" (2016)

관련 논문AI추천

이 간행물의 다른 논문 (8건)