임차물의 원상회복
The Restorative Work in the Lease Contract
0
조회
0
다운로드
8
인용
0
참고문헌
키워드
초록
The lessee should perform certain restorative and reparative work at the end of the lease period as good as a condition it had been in the beginning of the contract. The amount and the nature of the restoration work may involve destruction of a substantially completed building or other structure in accordance with the contract. Specific performance, including the remedying of a defective performance and/or for damages is the right of the lessor. The right to special performance is irrelevant to the right to damages. But the lessor may ordinarily follow the claim for damages because of the inefficiency and inconvenience of specific performance. The purpose of damage may put the lessor in as good as a condition he would have been in had the contract been performed. It compensates the difference with and without performance, the diminution in the value to him resulting from the failure to render remedial work. The damage for the diminution in the value to him may compensate for the lessor's actual loss, not the diminution in the market price of the property caused by the breach. The cost of cure is the proper damage in the failure of restoration work. The lessee could not have the right of use and reap the benefit from the contract without the consent of the lessor. The cost of cure is usually less than or equal to the diminution in the market price before restoration work. However, in cases the work to be required by the contract may become useless after its return for use, it may be vexatious to compel to stick to it. And if the cost of cure would be clearly disproportionate to the lessor's benefits attained, such an award will not be made. A ordinary property owner will not pay the cost upon his property more than the benefits to him from a practical standpoint. The primary purpose of the lease contract between the parties is merely to accomplish to economic recovery and the provisions of the lease contract pertaining to remedial work were incidental to the main object involved. There,completion of the work as contracted would be unreasonable and unrealistic. That is true, damages are limited to the difference in the market value with and without the promised restoration work. It may usually be it easier to prove the cost of cure, but the lessor should not attained the improvement of the reparation work. Besides, it may be impossible to prove the market value of the property because of the market's deficiency. In such a case, if there is a reasonable alternative to loss in value, he may claim damages based on that alternative, and in the determining the amount of damages, the court may award damage at liberty by means of alternative bases within a reasonable discretion.
Abstract
The lessee should perform certain restorative and reparative work at the end of the lease period as good as a condition it had been in the beginning of the contract. The amount and the nature of the restoration work may involve destruction of a substantially completed building or other structure in accordance with the contract. Specific performance, including the remedying of a defective performance and/or for damages is the right of the lessor. The right to special performance is irrelevant to the right to damages. But the lessor may ordinarily follow the claim for damages because of the inefficiency and inconvenience of specific performance. The purpose of damage may put the lessor in as good as a condition he would have been in had the contract been performed. It compensates the difference with and without performance, the diminution in the value to him resulting from the failure to render remedial work. The damage for the diminution in the value to him may compensate for the lessor's actual loss, not the diminution in the market price of the property caused by the breach. The cost of cure is the proper damage in the failure of restoration work. The lessee could not have the right of use and reap the benefit from the contract without the consent of the lessor. The cost of cure is usually less than or equal to the diminution in the market price before restoration work. However, in cases the work to be required by the contract may become useless after its return for use, it may be vexatious to compel to stick to it. And if the cost of cure would be clearly disproportionate to the lessor's benefits attained, such an award will not be made. A ordinary property owner will not pay the cost upon his property more than the benefits to him from a practical standpoint. The primary purpose of the lease contract between the parties is merely to accomplish to economic recovery and the provisions of the lease contract pertaining to remedial work were incidental to the main object involved. There,completion of the work as contracted would be unreasonable and unrealistic. That is true, damages are limited to the difference in the market value with and without the promised restoration work. It may usually be it easier to prove the cost of cure, but the lessor should not attained the improvement of the reparation work. Besides, it may be impossible to prove the market value of the property because of the market's deficiency. In such a case, if there is a reasonable alternative to loss in value, he may claim damages based on that alternative, and in the determining the amount of damages, the court may award damage at liberty by means of alternative bases within a reasonable discretion.
참고문헌 (35)
- 김규완, "일의 하자에 대한 수급인의 이행책임과 손해배상책임", 안암법학, (15) (2002)
- 김규완, "都給瑕疵擔保責任法과 一般債務不履行法― 대법원 2004. 8. 20. 선고 2001다70337 판결에 대한 평석 ―", 민사법학, (28), pp.201~234 (2005), 한국민사법학회
- 김제완, "도급계약상 담보책임으로서의 손해배상청구권의 법적 성격", 고려법학, (38) (2002)
- 김형석, "强制履行― 특히 間接强制의 補充性을 중심으로 ―", 서울대학교 법학, 46(4), pp.242~284 (2005), 법학연구소
- 남효순, "프랑스 민법에서의 매도인의 담보책임(Ⅱ)", 법학, 34(2) (1993)
- 명순구, "금전배상 이외의 손해배상과 그 적용례", 법학논집, 33 (1997)
- 문일봉, "선택적병합과 청구권병합", 법조, 48(3) (1999)
- 박동진, "손해배상액 산정기준으로서의 완전성이익과 가치이익", 민사법학, (21) (2002), 한국민사법학회
- 박찬주, "경제적 불능에 관한 개념 정립의 필요성", 인권과 정의, (396), pp.6~31 (2009), 대한변호사협회
- 이우룡, "건물임차인이 자신의 비용을 들여 증축한 부분의 소유권을 임대인에게 귀속시키기로 하는 약정의 효력", 재판실무연구 (1997), 광주지방법원
- 이준현, "임대차계약시 임차인의 비용상환 등의 청구에 대해 별도의 특약을 한 경우 그 특약의 의미에 대한 대법원판결의 비판적 검토", 인권과 정의, (316) (2002)
- 지원림, "사해행위에 기한 저당권설정과 원상회복, 민사판례연구(ⅩⅩⅩ)" (2008), 박영사
- 곽윤직, "민법주해(Ⅸ)" (1995), 박영사
- 곽윤직, "민법주해(ⅩⅣ)" (1997), 박영사
- 곽윤직, "민법주해(ⅩⅤ)" (1997), 박영사
- 곽윤직, "채권각론" (1984), 박영사
- 김형배, "채권총론" (1999), 박영사
- 김형배, "채권각론" (2001), 박영사
- 이은영, "채권각론" (2007), 박영사
- 지원림, "민법강의" (2010), 홍문사
- 양창수, "독일민법전" (2008), 박영사
- 서울지방법원 임대차소송실무연구회, "임대차소송실무" (1999)
- "법원실무제요 민사집행(Ⅲ)" (2003), 법원행정처
- Charles L. Knapp, "Problems in Contract Law, 6th ed" (2007), Aspen Publishers
- Douglas Laycock, "Modern American Remedies, 3rd ed" (2002), Aspen Publishers
- John D. Calamari, "Contracts, 5th ed", pp.2007, Tomson
- Laurence Koffman, "The Law of Contract, 6th ed" (2007), Oxford University Press
- Ole Lando, "Principles of European Contract Law, Parts Ⅰ and Ⅱ" (2000), Kluwer Law International
- "국내 판례"[URL]
- "CISG"[URL]
- "프랑스 민법"[URL]
- "독일 민법"[URL]
- "영국법"[URL]
- "Restatement (second) of Contracts"[URL]
- "유럽서비스계약법원칙"[URL]
