Optimization of Train Working Plan based on Multiobjective Bi-level Programming Model
0
조회
0
다운로드
1
인용
0
참고문헌
키워드
초록
The purpose of the high-speed railway construction is to better satisfy passenger travel demands. Accordingly,the design of the train working plan must also take a full account of the interests of passengers. Aiming atproblems, such as the complex transport organization and different speed trains coexisting, combined withthe existing research on the train working plan optimization model, the multiobjective bi-level programmingmodel of the high-speed railway passenger train working plan was established. This model considers theinterests of passengers as the center and also takes into account the interests of railway transport enterprises. Specifically, passenger travel cost and travel time minimizations are both considered as the objectives ofupper-level programming, whereas railway enterprise profit maximization is regarded as the objective of thelower-level programming. The model solution algorithm based on genetic algorithm was proposed. Throughan example analysis, the feasibility and rationality of the model and algorithm were proved.
Abstract
The purpose of the high-speed railway construction is to better satisfy passenger travel demands. Accordingly,the design of the train working plan must also take a full account of the interests of passengers. Aiming atproblems, such as the complex transport organization and different speed trains coexisting, combined withthe existing research on the train working plan optimization model, the multiobjective bi-level programmingmodel of the high-speed railway passenger train working plan was established. This model considers theinterests of passengers as the center and also takes into account the interests of railway transport enterprises. Specifically, passenger travel cost and travel time minimizations are both considered as the objectives ofupper-level programming, whereas railway enterprise profit maximization is regarded as the objective of thelower-level programming. The model solution algorithm based on genetic algorithm was proposed. Throughan example analysis, the feasibility and rationality of the model and algorithm were proved.
참고문헌 (12)
- B. Zhang, "Study on optimization of high-speed railway train operating scheme based on passenger's travel choice behavior", Railway Transport and Economy, 37(9), pp.48~53 (2015)
- J. M. Zhang, "Study on train operating scheme of Qingdao-Rongcheng inter-city railway based on IPxy model", Railway Transport and Economy, 37(9), pp.54~58 (2015)
- Y. H. Chang, "A multiobjective model for passenger train services planning: application to Taiwan's high-speed rail line", Transportation Research Part B, 34(2), pp.91~106 (2000)[DOI]
- F. Shi, "Research on passenger train plans for dedicated passenger traffic lines", Journal of the China Railway Society, 26(2), pp.16~20 (2004)
- K. Ghoseiri, "A multi-objective train scheduling model and solution", Transportation Research Part B: Methodological, 38(10), pp.927~952 (2004)[DOI]
- F. Shi, "Boarding choice behavior and its utility of railway passengers", China Railway Science, 28(6), pp.117~121 (2007)
- X. W. Hai, "Transport capacity resources optimizing allocation of passenger dedicated line", pp.2014
- X. Xiong, "Research on high speed railway line planning based on mixed set programming", pp.2012
- L. B. Deng, "Study on the optimal problems of passenger train plan for dedicated passenger traffic line", pp.2007
- Y. T. Niu, "Theory and method of train line planning of networked passenger dedicated lines", pp.2010
- "China Railway Information Technology Center of China Academy of Railway Sciences"[URL]
- T. F. Zhang, "Study on the train scheme of passenger dedicated line", pp.2013
