맞춤형 야구복의 효율적 생산관리를 위한 공정관리 분석
Process Control Analysis for Efficient Production Management of Customized Baseball Uniforms
0
조회
0
다운로드
1
인용
0
참고문헌
키워드
초록
To increase the productivity and product quality of customized baseball jerseys, this study developed a multivariable system for a production process that efficiently controls diverse production management factors. The working time was measured through the establishment of a standard process where skilled workers and Chinese factory workers manufactured 5 sets of the same basic design jerseys. Based on the measured working time (1,136 seconds/per unit), the multi-variable process control system was developed, where hourly production management is possible according to the involved workers and equipment types. Each process was assigned accoding to the production management factors for a total of 28 standard processes. The processes were developed based on consideration of work characteristics according to the order of needlework of open-type set baseball jerseys with sleeves(the basic design of baseball jerseys)to result in a customized production system structure that could be set up with multi-variables. As a result, a total 12 types of systems were developed in consideration of the personnel involved and the number of equipments. The optimal production management system (with the highest efficiency compared to the number of workers)was A-2, B-1, C-1. D-2, E-2, F-1,and G-1. This system had extremely high efficiency and showed 99% assignment efficiency for the 7-person team. Though not optimal, possible process assignment for each working personnel is proposed as a reserve process in case work modification is inevitable due to malfunctions and the absence of equipments.
Abstract
To increase the productivity and product quality of customized baseball jerseys, this study developed a multivariable system for a production process that efficiently controls diverse production management factors. The working time was measured through the establishment of a standard process where skilled workers and Chinese factory workers manufactured 5 sets of the same basic design jerseys. Based on the measured working time (1,136 seconds/per unit), the multi-variable process control system was developed, where hourly production management is possible according to the involved workers and equipment types. Each process was assigned accoding to the production management factors for a total of 28 standard processes. The processes were developed based on consideration of work characteristics according to the order of needlework of open-type set baseball jerseys with sleeves(the basic design of baseball jerseys)to result in a customized production system structure that could be set up with multi-variables. As a result, a total 12 types of systems were developed in consideration of the personnel involved and the number of equipments. The optimal production management system (with the highest efficiency compared to the number of workers)was A-2, B-1, C-1. D-2, E-2, F-1,and G-1. This system had extremely high efficiency and showed 99% assignment efficiency for the 7-person team. Though not optimal, possible process assignment for each working personnel is proposed as a reserve process in case work modification is inevitable due to malfunctions and the absence of equipments.
참고문헌 (5)
- 강인애, "패턴설계요소기반의 디자인 분류 및 패턴탐색 알고리즘개발 - 맞춤양산형 야구복 자동패턴 설계시스템을 위한 -", 한국의류산업학회지, 13(5), pp.734~742 (2011), 한국의류산업학회
- 김진선, "국내 의류업체의 생산관리에 관한 실태조사 - 어패럴기업과 생산업체를 중심으로 -", 한국디자인포럼, 25(25), pp.23~34 (2009), 한국디자인트렌드학회
- Kim, S. B., "의류제품 생산관리 전문가 업무능력 향상을 위한 재교육" (2010), The Korean Society of Clothing and Textiles(KSCT)
- Kim, T. S., "현대작업관리" (2004), Bookshill
- 홍경희, "의류봉제업체의 생산현황과 대량맞춤에 대한 인식", 한국의류산업학회지, 12(2), pp.162~171 (2010), 한국의류산업학회
