가파도 마이크로그리드 신재생 에너지 전원 구성 방안
Renewable Energy Configuration Plan of Micro Grid in Gapa Island
1
조회
0
다운로드
2
인용
0
참고문헌
키워드
초록
This paper presents a renewable energy configuration plan of Micro grid in Gapa Island. To analyze the characteristics of Micro grid, BESS (Battery Energy Storage System), PMSG (Permanent Magnet Synchronous Generator) and SCIG (Squirrel Cage Induction Generator) are first modelled. The PMSG and SCIG will operate with basis on the real power curve. when the total power demand is larger than the total power generation, the BESS will be operated and the SOC (State Of Charge) is reduced. If the value of SOC could drop down to limited value, the system may be broken because of the voltage drop of BESS. To solve this problem, a DG (Diesel Generator) is used to charge the BESS and keep the voltage value of BESS within a allowance limit. This paper represents simulation result when PMSG, SCIG connected to the Micro grid installed in Gapa Island. The simulation is carry out by using PSCAD/EMTDC program with actual line constant and transformer parameter in Gapa Island.
Abstract
This paper presents a renewable energy configuration plan of Micro grid in Gapa Island. To analyze the characteristics of Micro grid, BESS (Battery Energy Storage System), PMSG (Permanent Magnet Synchronous Generator) and SCIG (Squirrel Cage Induction Generator) are first modelled. The PMSG and SCIG will operate with basis on the real power curve. when the total power demand is larger than the total power generation, the BESS will be operated and the SOC (State Of Charge) is reduced. If the value of SOC could drop down to limited value, the system may be broken because of the voltage drop of BESS. To solve this problem, a DG (Diesel Generator) is used to charge the BESS and keep the voltage value of BESS within a allowance limit. This paper represents simulation result when PMSG, SCIG connected to the Micro grid installed in Gapa Island. The simulation is carry out by using PSCAD/EMTDC program with actual line constant and transformer parameter in Gapa Island.
참고문헌 (7)
- 이계병, "에너지 저장장치를 이용한 마이크로그리드의 구현", 전기학회논문지ABCD, 59(2), pp.248~254 (2010), 대한전기학회
- 진경민, "제주지역 계통운전조건을 고려한 풍력발전단지용 최소 BESS 용량 산정", 한국태양에너지학회 논문집, 33(4), pp.39~45 (2013), 한국태양에너지학회
- Jong-Yul Kim, "Contribution of an Energy Storage System for Stabilizing a Microgrid during Islanded Operation", Journal of Electrical Engineering & Technology, 4(2), pp.194~200 (2009), 대한전기학회
- 이우종, "3상 인버터의 계통연계 및 독립운전모드 전환 연구", 전기학회논문지, 62(2), pp.201~207 (2013), 대한전기학회[DOI]
- 송승호, "유도형 풍력발전기 계통 연계시 돌입전류 저감을 위한 소프트 스타터 점호각 제어", 전력전자학회 논문지, 10(4), pp.397~402 (2005), 전력전자학회
- 이지헌, "농형유도 풍력발전기의 성능개선을 위한 에너지저장장치의 동작특성 분석", 전기학회논문지ABCD, 58(6), pp.1138~1145 (2009), 대한전기학회
- Ahmed A. Daoud, "Control Scheme of PMSG Based Wind Trubine for Utility Network Connection", 10th International Conference on Environment and Electircal Engineering(EEEIC) (2011)