Promising onshore wind farm sites in Gangwon province of Korea were investigated in this study. Gangwon province was divided into twenty five simulation regions and a commercial program based on Reynolds averaged Navier-Stokes equation was used to find out wind resource maps of the regions. The national wind atlas with a period 2007-2009 developed by Korea institute of energy research was used as climatologies. The wind resource maps were combined to construct a wind resource map of Gangwon province with a horizontal spatial resolution of 100m. In addition to the wind resource, national environmental zoning map, distance from substation, residence and automobile road, Beakdudaegan mountain range, terrain slope, airport and military reservation district were considered to find out promising wind farm sites. A commercial wind farm design program was used to find out developable wind farm capacities in promising wind farm site with and without excluding environmental protection regions. The total wind farm capacities with and without excluding the protection regions were estimated to be 46MW and 598MW, respectively, when a 2MW commercial wind turbine was employed.

Abstract

Promising onshore wind farm sites in Gangwon province of Korea were investigated in this study. Gangwon province was divided into twenty five simulation regions and a commercial program based on Reynolds averaged Navier-Stokes equation was used to find out wind resource maps of the regions. The national wind atlas with a period 2007-2009 developed by Korea institute of energy research was used as climatologies. The wind resource maps were combined to construct a wind resource map of Gangwon province with a horizontal spatial resolution of 100m. In addition to the wind resource, national environmental zoning map, distance from substation, residence and automobile road, Beakdudaegan mountain range, terrain slope, airport and military reservation district were considered to find out promising wind farm sites. A commercial wind farm design program was used to find out developable wind farm capacities in promising wind farm site with and without excluding environmental protection regions. The total wind farm capacities with and without excluding the protection regions were estimated to be 46MW and 598MW, respectively, when a 2MW commercial wind turbine was employed.

참고문헌 (13)

  1. 2014 Half Year Report, "World Wind Energy Association", ~ (2014)
  2. The 6th Basic Plan for Electricity Supply and Demand, "Ministry of Trade, Institute & Energy", ~ (2012)
  3. Environmental Assessment Guidelines of Onshore wind development project related Enforcement (report material), "Ministry of Environmental", Ministry of Trade, Institute & Energy, 63~ (2014)
  4. "SRTM 90m Digital Elevation Data" (2008)[URL]
  5. Ministry of Environmental, "Build of Land cover classification using satellite image data", ~ (2002)
  6. Kim. J H, "Selection of Promising Wind Farm Sites on Complex Terrain in Korea", 7~ (2013)
  7. "Wind energy resource evaluation in a site of central Italy by CFD simulations" (2007)[URL]
  8. "Spatial Environmental Information Services, National Environmental Zoning Map", ~ (2010)
  9. The Korea Transport Institute, "The explaining material for transportation digital map", ~ (2011)
  10. The Study of Forest Management Practices on Wind Farm Installation, "Korea Forest Research Institute", 46~ (2014)
  11. Onshore Wind Power Systems (ONSWPS) : A GIS-Based Tool for Preliminary Site-Suitability Analysis, "Jeffry D. Harrison", 40~ (2012)
  12. GIS-based wind farm site Selection using Spatial Multi-Criteria Analysis (SMCA): Evaluating the Case for New York State, "Rob van Haaren", 3334~ (2011)
  13. National Legal Information Center, "Protection Law of Baekdudaegan Mountain Range (Enforcement 2014.9.12.)", ~ (2014)

관련 논문AI추천

이 간행물의 다른 논문 (9건)