본문 바로가기
KERD
논문KCI 등재

공장 자동화를 위한 다열 배치에서의 작업자 할당

Workforce Assignment in Multiple Rows for Factory Automation

0

조회

0

다운로드

0

인용

0

참고문헌

주제분류산업공학

초록

Abstract

This paper considers the workforce assignment problem to minimize both the deviations of workloads assigned to workers and to maximize the total preference between each worker and each machine. Because of the high expense of technology education and the difficulties of firing employees, there is no part time workers in semiconductor industry. Therefore, multi-skilled workers are trained for performing various operations in several machines. The bicriteria workforce assignment problem in this paper is not easy to obtain the optimal solution considering the aisle structure and it is belong to NP-class. The proposed heuristic algorithms are developed based on the combination of spacefilling curve technique, simulated annealing technique and graph theory focusing on the multiple-row machine layout. Examples are presented for the proposed algorithms how to find a good solution.

참고문헌 (39)

  1. Askin, "Forming effective work teams for cellular manufacturing", 39(11), pp.2431~2451 (2001)
  2. Baker, "Workforce allocation in cyclical scheduling problems", 27, pp.155~167 (1976)
  3. Bartholdi, "planar traveling salesman heuristic based on spacefilling curves", 1, pp.121~125 (1982)
  4. Bartholdi,J. J, "Design of efficient bin-numbering schemes for warehouses", 4, pp.1988~
  5. Billionnet,A, "Integer programming to schedule a hierarchical workforce with variable demands", 114, pp.105~114 (1999)
  6. Bozer,Yavuz A.,Meller,Russell D, "An improvement type layout algorithm for single and multiple-floor facilities Management Science", (7), pp.1994~
  7. Brusco,M. J.,John,T. R, "Cross utilization of a two skilled workforce", 18(6), pp.555~564 (1998)
  8. Burns,R. N, "A modular approach to optimal multiple-shift manpower scheduling", 35(1), pp.100~110 (1987)
  9. Cho,S. A.,Kim,Chae-Bogk, "Single machine MAD", Tmax problem with a common due date Computers & Operations Research, pp.255-262., pp.(3), 1991~
  10. Cochran, "Dynamic dispatching rule-pairs for multitasking workers in JIT production systems", 37(10), pp.2175~2190 (1999)
  11. Connolly, "An improved annealing scheme for the QAP", 46, pp.1990~
  12. Dal-El,E. M, "Assembly line sequencing for model mixing", 13, pp.1975~
  13. Dahlen,P.,Ericsson,J, "Labour stability and flexibility-conditions to reach just in time", 15(9), pp.26~43 (1995)
  14. Downey,B. S, "Assembly line with flexible work force", 30 no. 3, pp.469~83 (1992)
  15. Dowsland, "An exact algorithm for the pallet loading problem", 31, pp.1987~
  16. Dowsland, "Efficient automated pallet loading", 44, pp.1990~
  17. Ebeling,A. C, "Cross training effectiveness and profitability", 32 no. 12, pp.2843~59 (1994)
  18. Grag,S.,Vart,P, "Trade-offs between multiskilling and inventory in assembly lime operations under demand variability", 22(5), pp.565~583 (2002)
  19. Harary, "Graph Theory" (1972), Addison-Wesley Publishing Company
  20. Heragu,S. S, "Efficient models for the facility layout problem", 53, pp.1991~
  21. Kim, "Minimizing the mean squared deviation from a commom due date", 7, pp.492~502 (1996)
  22. Kim,C.,Kim,S.,and Foote,B. L, "Assignment problems in single-row and double-row machine layouts during slow and peak periods", 30(3), pp.411~422 (1996)
  23. Kouvelis,Panagiotis, "A simulated annealing procedure for single row layout problems in flexible manufacturing systems", 30(4), pp.717~732 (1992)
  24. Laarhoven,P. J. M.,Aarts,E. H. L, "Job shop scheduling by simulated annealing Operations Research", (1), pp.1992~
  25. Levitin,G, "Genetic algorithm for linear and cyclic assignment problem", 20(6), pp.575~586 (1993)
  26. Liang, "Improving the utilization of training resources through optimal personnel assignmnet in the U.S. navy European Journal of Operational Research", 33 (1988)
  27. Miltenburg,John, "Level schedules for mixed-model assembly lines in just in time production systems", 35 no. 2, pp.192~207 (1989)
  28. Miltenburg,John, "Developing production schedules which balance part usage and smooth production loads for just-in-time production systems", 38, pp.1991~
  29. Norman, "Worker assignment in cellular manufacturing considering technical and human skills International Journal of Production Research. Vol. 40 NO. 6", 40(6), pp.1479~1492 (2002)
  30. Plenert,G, "Line balancing techniques as used for just-in-time product lime optimization", 8(7), pp.686~93 (1997)
  31. Sanjay, "Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times", 38(10), pp.2233~2252 (2000)
  32. Sarker, "Optimum manpower models for a production system with varying production rates", 24, pp.1986~
  33. Seo, "Minimizing mean squared deviation of completion times with maximum tardiness constraint European Journal of Operational Research", 33 (1988)
  34. Suryanarayanan,J. K.,Golden,B. L, "A new heuristic for the linear placement problem Computers & Operations Research", (3), pp.1991~
  35. Shin, "Uniform assembly line balancing with stochastic task times in just-in-time manufacturing. International Journal of Operations and Production Management", pp.23~34 (1991)
  36. Sule, "Manpower assignment strategies in serial production limes with limited personnel evaluation of pull-push rules. Computer and Industrial Engineering", pp.231~243 (1992)
  37. Van Oyen, "Performance opportunity for workforce agility in collaborative and non-collaborative work system. IIE Transactions", 33, pp.807~818 (2001)
  38. R. V, "The cost of Consecutivity in the", 19, pp.296~299 (1987)
  39. Wilhelm,M. R, "Solving quadratic assignment problems by simulated annealing problem", pp.1987~

관련 논문AI추천

이 간행물의 다른 논문 (14건)