논문KCI 등재
추가자원제약을 갖는 Job Shop 작업계획의 성능 비교
A Comparison of Dispatching Rules for Auxiliary Resource Constrained Job Shop Scheduling
1
조회
0
다운로드
0
인용
0
참고문헌
주제분류산업공학
초록
Abstract
This study presents the new dispatching rules of job shop scheduling with auxiliary resource constraint to improve the schedule performance measures related to completion time and due dates. The proposed dispatching rules consider the information of total work remaining and machine utilization to decrease mean flowtime and mean tardiness. The results of computer experiments show that those schedule performances are significantly improved by using the new dispatching rules. The results provide guidance for the researchers and practitioners of auxiliary resource constrained job shop scheduling to decrease mean flowtime and mean tardiness.
참고문헌 (13)
- "Two New Rules to Minimize Tardiness in a Job Shop", 28(12), pp.1990~
- "Introduction to Sequencing and Scheduling", pp.~8 (1974), John Wiley & Sons Inc.
- "A Dynamic Priority Rule for Scheduling against Due Dates", 3, pp.37~42 (1982)
- "Job Shop Scheduling with Modified Due Dates", 4, pp.11~21 (1983)
- "Priority Dispatching and Job Lateness in a Job Shop", 16 no. 4, pp.1965~
- "Information and Scheduling in A Dual Resource Constrained Job Shop", 34(10), pp.2783~2802 (1996)
- "Scheduling Research in Multiple Resource Constrained Job Shops Journal of Operations Management", 34(8), pp.2077~2097 (1996)
- "Server Transfer Delays in A Dual Resource Constrained Parallel Queueing System", 25 no. 12, pp.1979~
- "A Backward Approach in List Scheduling Algorithms for Multi-Machine Tardiness Problems", 22(3), pp.307~319 (1995)
- "A Comparison of Dispatching Rules for Job Shops with Multiple Identical Jobs and Alternative Routeings", 28 no. 5, pp.1990~
- "Due Date Based Scheduling in a General Flexible Manufacturing System", 8(2), pp.1989~
- "An Expediting Heuristic for the Shortest Processing Time Dispatching Rule", 21 no. 1, pp.1989~
- "Priority Rules for Job Shops with Weighted Tardiness Costs", 33(8), pp.1035~1047 (1987)
관련 논문AI추천
Job Shop 일정계획의 성능 향상을 위한 할당규칙의 정보배상윤한국산업경영시스템학회 · 한국산업경영시스템학회지2006 · 제29권 제4호Job Shop 작업계획의 실제적 접근을 위한 할당규칙배상윤한국산업경영시스템학회 · 한국산업경영시스템학회지2002 · 제25권 제3호지연 스케쥴을 허용하는 납기최소화 잡샵 스케쥴링 알고리즘김재곤, 방준영한국산업경영시스템학회 · 한국산업경영시스템학회지2019 · 제42권 제1호유연흐름생산에서의 일정계획 문제 해결을 위한 효율적인 알고리즘윤석진한국생산관리학회 · 한국생산관리학회지2003 · 제13권 제3호부품외주를 고려한 조립형 Flowshop 일정계획문제 연구전재호한국산업경영시스템학회 · 한국산업경영시스템학회지2006 · 제29권 제4호Rate-Modifying 활동이 있는 병렬기계의 Makespan 최소화를 위한 일정 계획임승빈, 정인재, 조항민한국산업경영시스템학회 · 한국산업경영시스템학회지2007 · 제30권 제2호
