클러스터 제조 라인의 작업할당 및 물류 운영 시나리오
Job Allocation and Operation Scenario of Automated Material Handling for Cluster-Type Production System
0
조회
0
다운로드
0
인용
0
참고문헌
키워드
초록
Recently, to improve operating efficiency with the higher in-line rate in automated production lines, a lot of cases of grouping machines and material handling system together to form a cluster has shown frequently. This article addresses the job allocation and operation method of automated material handling for cluster-type production systems. First of all, the control problems of the automated material handling systems are classified into the control problem of inter-cluster material handling system and that of intra-cluster material handling system. Then, a distributed agent-based control scheme is proposed for the former, and an operational control procedure for the latter. Simulation experiment shows that the proposed method is efficient in reducing cycle times and improving utilization of material handling vehicles.
Abstract
Recently, to improve operating efficiency with the higher in-line rate in automated production lines, a lot of cases of grouping machines and material handling system together to form a cluster has shown frequently. This article addresses the job allocation and operation method of automated material handling for cluster-type production systems. First of all, the control problems of the automated material handling systems are classified into the control problem of inter-cluster material handling system and that of intra-cluster material handling system. Then, a distributed agent-based control scheme is proposed for the former, and an operational control procedure for the latter. Simulation experiment shows that the proposed method is efficient in reducing cycle times and improving utilization of material handling vehicles.
참고문헌 (9)
- Gupta,A.K, "Job shop scheduling techniques in semiconductor manufacturing", International Journal of Advanced Manufacturing Technology, 27(11), pp.1163~1169 (2004)
- Gupta,A.K, "Optimization of due-date objectives in scheduling semiconductor batch manufacturing", International Journalof Machine Tools and Manufacture, 46, pp.1671~1679 (2006)
- Kim,Y.D, "Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility", IEEE Transactions on Semiconductor Manufacturing, 11(1), pp.155~164 (1998)
- Kim,Y.D, "Production scheduling in a semiconductor wafer fabrication facility producing multiple product type with distinct due dates", IEEE Transactions on Robotics and Automation, 17(5), pp.589~598 (2001)
- Lee,Y.H, "Daily planning and scheduling system for the EDS process in a semiconductor manufacturing facility", International Journal of Advanced Manufacturing Technology, 41, pp.568~579 (2009)
- Lu,S.H, "Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants", IEEE Transactions on Semiconductor Manufacturing, 7(3), pp.374~388 (1994)
- Upasani,A.A, "A problem reduction approach for scheduling semiconductor wafer fabrication facilities", IEEE Transactions on Semiconductor Manufacturing, 19(2), pp.216~225 (2006)
- Uzsoy,R, "A review of production planning and scheduling models in the semiconductor industry Part II:Shop-floor control", IIE Transactions, 26(5), pp.44~55 (1994)
- Wein,L.M, "Scheduling semiconductor wafer fabrication", IEEE Transactions on Semiconductor Manufacturing, 1(3), pp.115~130 (1988)
