활동기준예방에 의한 프로젝트 품질코스트 최소화
Minimizing Project Quality Costs by Activity-Based Prevention
0
조회
0
다운로드
0
인용
0
참고문헌
키워드
초록
Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers’ requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.
Abstract
Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers’ requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.
참고문헌 (30)
- 김종열, "클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형", 산업경영시스템학회지, 34(3), pp.97~105 (2011), 한국산업경영시스템학회
- Abdelsalam,H.M.E, "Cost of quality in Dubai:An analytical case study of residential construction projects", International Journal of Project Management, 27, pp.501~511 (2009)
- Avots,I, "Information systems for matrix organisations in Cleveland David, 1st ed., In Matrix management systems handbook" (1984), Van Nostrand Reinhold
- Babu,A.J.G, "Project Management with Time,Cost,and Quality Considerations", European Journal of Operational Research, 88, pp.320~327 (1996)
- Barnes,N.M.L, "The future for major project management", International Journal of Project Management, 11(3), pp.135~142 (1993)
- Burke,R, "Project Management Planning and Control, Stratford Upon Avon" (1995), Management Press
- Cervone,H.F, "Project risk management", OCLC Systems and Services:International Digital Library Perspectives, 22(4), pp.256~262 (2006)
- Cnuddle,M, "Lack of quality in construction economic losses", Proceddings of 1991 European Symposium on Management,Quality and Economics in Housing and other Building Sectors, pp.508~515 (1991)
- Crosby,P.B, "Quality Is Free" (1979), McGraw-Hill
- Crosby,P.B, "Quality Without Tears" (1984), Penguin Books
- Dale,B.G, "Quality Costing" (1995), Chapman and Hill
- Elmaghraby,S.E, "Optimal linear approximation in project compression", IIE Transactions, 16(4), pp.339~347 (1984)
- Feigenbaum,A.V, "Total quality control", Harvard Business Review, 34(6), pp.93~101 (1956)
- Ford,L.R, "Flows in net works" (1962), Princeton University Press
- Goyal,S.K, "A note on simple CPM time-cost tradeoff algorithm", Management Science, 21(6), pp.718~722 (1975)
- Hall,M, "A Cost of Quality Analysis of a Building Project:towards a Complete Methodology for Design and Build", Construction Management and Economics, 19, pp.727~740 (2001)
- Juran,J.M, "Quality Planningand Analysis" (1980), McGraw-Hill
- Kapur,K.C, "An algorithm for the project cost", duration analysis problem with quadratic and convex cost functions, 1973, pp.5, 314~322
- Kelley,J.E, "Critical Path Planning and Scheduling : An Introduction", Mauchly Associate, ~ (1959)
- Kelley,J.E, "Critical-path planning and scheduling:mathematical basis", Operations Research, 9(3), pp.296~320 (1961)
- Kendrick,T, "Identifying and Managing Project Risk", AMACOM, ~ (2003)
- Khang,D, "Time,cost and quality tradeoff in project management:a case study", International Journal of Project Management, 17(4), pp.249~256 (1999)
- Kim,J.Y, "A Practical Approach to Project Scheduling:Considering the Potential Quality Loss Cost in the Time-Cost Tradeoff Problem", International Journal of Project Management (2011)
- Koushki,P.A, "Delays and cost increases in the construction of private residential projects in Kuwait", Construction Management and Economics, 23, pp.285~294 (2005)
- Lamberson,L.R, "Optimum time compression in project scheduling", Management Science, 16(10), pp.B597~B606 (1970)
- Project Management Institute, "A Guide to the Project Management Body of Knowledge, 4th ed." (2008), PMI Publications
- Shenhar,A.J, "Mapping the dimensions of project success", Project Management Journal, 28(2), pp.5~13 (1997)
- Siemens,N, "A simple CPM time-cost tradeoff algorithm", Management Science, 17(6), pp.B354~B363 (1971)
- Siemens,N, "Reducing project duration at minimum cost:a time", cost trade-off algorithm, 1975, pp.3, 569~581
- Wit,A.D, "Measurement of project success", Project Management, 6(3), pp.164~170 (1988)