프로젝트 진도 측정 방법의 비교와 적용에 관한 연구

A Study on the Comparison and Application of the Methods of Measuring Projects’ Progress

0

조회

0

다운로드

0

인용

0

참고문헌

키워드

주제분류산업공학

초록

The progress that becomes a basis for measuring the outcome of project is a core of project control. Follow-up corrective actions are determined depending on the degree of their differences. The methods of measuring the project progress have been developed though a variety of research and many were verified through the cases. Among such methods, this study selected Start/Finish method and Fixed Formula method. In order to check the limitations of the progress utilized in the two methods,the study compared their progresses to the progress of Percentage Complete method and analyzed the differences shown in their actual applications. Through this, it suggested the forms and scale of the projects appropriate to the application of Fixed Formula method. As for the research progress method, the study first generated a number of virtual project schedules for the establishment of an analysis model. These project schedules were varied in a way that they had different project periods and the number of different activities. The study also generated numerous project schedules for difference test. After establishing a virtual schedule plan by the scale of projects, it measured their progresses by period, analyzed the differences and repeated this procedure to obtain the results.

Abstract

The progress that becomes a basis for measuring the outcome of project is a core of project control. Follow-up corrective actions are determined depending on the degree of their differences. The methods of measuring the project progress have been developed though a variety of research and many were verified through the cases. Among such methods, this study selected Start/Finish method and Fixed Formula method. In order to check the limitations of the progress utilized in the two methods,the study compared their progresses to the progress of Percentage Complete method and analyzed the differences shown in their actual applications. Through this, it suggested the forms and scale of the projects appropriate to the application of Fixed Formula method. As for the research progress method, the study first generated a number of virtual project schedules for the establishment of an analysis model. These project schedules were varied in a way that they had different project periods and the number of different activities. The study also generated numerous project schedules for difference test. After establishing a virtual schedule plan by the scale of projects, it measured their progresses by period, analyzed the differences and repeated this procedure to obtain the results.

참고문헌 (17)

  1. 안태호, "프로젝트 포트폴리오 평가 문제 : 시뮬레이션을 이용한 다속성 평가를 중심으로", 한국경영공학회지, 13(1), pp.233~253 (2008), 한국경영공학회
  2. Bae, S.H., "A study on efficiency of progress management in construction project", 석사, pp.1990
  3. Barrie, D.S., "Professional Construction Management" (1992), McGrawHill
  4. 최윤기, "내역물량 측정에 의한 건설공사진도율 산정시스템", 한국건설관리학회 논문집, 4(3), pp.137~145 (2003), 한국건설관리학회
  5. Choi, Y. K., "Construction progress measurement system by integrating schedule and cost", 박사, pp.1999
  6. Clark, F.D., "Applied Cost Engineering" (1997), Marcel Dekker
  7. Construction Industry Institute, "Project Control for Construction" (1987), Construction Industry Institute
  8. Fleming, Q.W., "Earned Value Project Management", Project Management Institute, ~ (1996)
  9. Jung, Y.S., "Standardized Progress Measurement Package", Korea Institute of Construction Engineering and Management. The 5th Conference Proceeding, pp.565~570 (2004), Korea Institute of Construction Engineering and Management
  10. 김종수, "웹서비스 기술의 프로젝트 평가관리시스템에의 응용", 산업경영시스템학회지, 27(1), pp.57~63 (2004), 한국산업경영시스템학회
  11. Korea Project Management Association, "Project Management", pp.214~ (2010), Dae-Young Sa
  12. A methodological improvement study of progress measurement and progress payment methods in the construction project, "Lee, B. N.", Construction Economy Research Institute of Korea, ~ (1997)
  13. Lee, S. H., "A construction progress measurement method based on earned value management system", 석사, pp.2000
  14. Practice Standard for Earned Value Management, "Project Management Institute", Project Management Institute, 10~11 (2005)
  15. Shin, H.P., "An introduction to cost estimation for construction" (2001), Construction Daily
  16. Thoma, H.R., "An Analysis of the Methods for Measuring Construction Productivity", CII Source Document, 13 (1986)
  17. Won, D. S., "Methods of establishing the optimal performance measurement baseline and evaluating the progress for implementing EVMS", 석사, pp.2002

이 간행물의 다른 논문 (16건)