단일 복구조정활동 하에 단계적 퇴화를 가지는 단일기계 생산일정계획
Single Machine Scheduling Problem with Step-deterioration under A Rate-modifying Activity
1
조회
0
다운로드
0
인용
0
참고문헌
키워드
초록
In this paper, we deal with a single machine scheduling problems integrating with step deterioration effect and a rate-modifying activity (RMA). The scheduling problem assumes that the machine may have a single RMA and each job has the processing time of a job with deterioration is a step function of the gap between recent RMA and starting time of the job and a deteriorating date that is individual to all jobs. Based on the two scheduling phenomena, we simultaneously determine the schedule of step deteriorating jobs and the position of the RMA to minimize the makespan. To solve the problem, we propose a hybrid typed genetic algorithm compared with conventional GAs.
Abstract
In this paper, we deal with a single machine scheduling problems integrating with step deterioration effect and a rate-modifying activity (RMA). The scheduling problem assumes that the machine may have a single RMA and each job has the processing time of a job with deterioration is a step function of the gap between recent RMA and starting time of the job and a deteriorating date that is individual to all jobs. Based on the two scheduling phenomena, we simultaneously determine the schedule of step deteriorating jobs and the position of the RMA to minimize the makespan. To solve the problem, we propose a hybrid typed genetic algorithm compared with conventional GAs.
참고문헌 (34)
- Alidaee, B., "Scheduling with time dependent processing times : review and extensions", Journal of the Operational Research Society, 50(7), pp.711~721 (1999)
- Bachman, A., "Minimizing the total weighted completion time of deteriorating jobs", Information Processing Letters, 81(2), pp.81~84 (2002)
- Bahalke, U., "Metaheuristics to solve single-machine scheduling problem with sequence-dependent setup time and deteriorating jobs", International Journal of Advanced Manufacturing Technology, 50(5-8), pp.749~759 (2010)
- Bank, M., "Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration", Advances in Engineering Software, 47(1), pp.1~6 (2012)
- Browne, S., "Scheduling deteriorating jobs on a single processor", Operations Research, 38, pp.495~498 (1999)
- Cheng, T.C.E., "Single machine scheduling with deadlines and increasing rates of processing times", Acta Informatica, 36, pp.673~692 (2000)
- Cheng, T.C.E., "Single machine scheduling with step-deteriorating processing times", European Journal of Operational Research, 134(3), pp.623~630 (2001)
- Cheng, T. C. E., "A concise survey of scheduling with time-dependent processing times", European Journal of Operational Research, 152, pp.1~13 (2004)
- Cheng, T.C.E., "Single-machine scheduling with deteriorating jobs and setup times to minimize the maximum tardiness", Computers and Operations Research, 38(12), pp.1760~1765 (2011)
- Gen, M., "Genetic Algorithms and Engineering Optimization" (2000), Wiley
- Gupta, J.N.D., "Single facility scheduling with nonlinear processing times", Computers and Industrial Engineering, 14, pp.387~393 (1988)
- Huang, X., "Parallel identical machines scheduling with deteriorating jobs and total absolute differences penalties", Applied Mathematical Modelling, 35(3), pp.1349~1353 (2011)
- Iranpoor, M., "Machine scheduling in the presence of sequence-dependent setup times and a rate-modifying activity", International Journal of Production Research, 50(24), pp.7401~7414 (2012)
- Jafari, A., "Scheduling linear deteriorating jobs to minimize the number of tardy jobs", Journal of Global Optimization, 54(2), pp.389~404 (2012)
- 김병수, "Single-Machine Total Completion Time Scheduling with Position-Based Deterioration and Multiple Rate-Modifying Activities", Industrial Engineering & Management Systems, 10(4), pp.247~254 (2011), 대한산업공학회
- Kovalyov, M.Y., "A fully polynomial approximation scheme for minimizing makespan of deteriorating jobs", Journal of Heuristics, 3(4), pp.287~297 (1988)
- Kubiak, W., "Scheduling deteriorating jobs to minimize makespan", Naval Research Logistics, 45(5), pp.511~523 (1998)
- Kunnathur, A.S., "Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem", European Journal of Operational Research, 47(1), pp.56~64 (1990)
- Lee, C.Y, "Single-machine scheduling with maintenance and repair rate-modifying activities", European Journal of Operational Research, 135, pp.493~513 (2001)
- Lee, C.Y., "Scheduling of jobs and maintenance activities on parallel machines", Naval Research Logistics, 47, pp.61~67 (2000)
- Lee, C.Y., "Machine scheduling with a rate-modifying activity", European Journal of Operational Research, 128, pp.119~128 (2001)
- Lodree, E.J., "A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration", European Journal of Operational Research, 201(2), pp.644~648 (2010)
- Mosheiov, G., "Scheduling a maintenance activity and due-window assignment on a single machine", Computers and Operations Research, 36(9), pp.2541~2545 (2009)
- Mosheiov, G., "Scheduling jobs with step-deterioration; Minimizing makespan on a single- and multi-machine", Computers and Industrial Engineering, 28(4), pp.869~879 (1995)
- Mosheiov, G., "V-Shaped polices to scheduling deteriorating jobs", Operation Research, 39, pp.979~991 (1991)
- Moslehi, G., "Minimizing the number of tardy jobs under piecewise-linear deterioration", Computers and Industrial Engineering, 59(4), pp.573~584 (2010)
- Qi, X., "Scheduling the maintenance on a single machine", Journal of the Operational Research Society, 50, pp.1071~1078 (1990)
- Ruiz-Torres, A-J., "Parallel machine scheduling to minimize the makespan with sequence dependent deteriorating effects", Computers and Operations Research, 40, pp.2051~2061 (2013)
- Sundararaghavan, P.S., "Single machine scheduling with start time dependent processing times : some solvable cases", European Journal of Operational Research, 78(3), pp.394~403 (1994)
- Wang, J.L., "Single-machine total completion time scheduling with a time-dependent deterioration", Applied Mathematical Modelling, 35, pp.1506~1511 (2011)
- Yang, D.-L., "Unrelated parallel-machine scheduling problems with multiple rate-modifying activities", Information Science, 235, pp.280~286 (2013)
- Yang, D.-L., "Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities", Computers and Operations Research, 39, pp.1458~1464 (2012)
- Yang, D. -L., "Parallelmachine scheduling with controllable processing times and rate-modifying activities to minimise total cost involving total completion time and job compressions", International Journal of Production Research, 52(4), pp.1133~1141 (2013)
- Zhao, C., "A note to due-window assignment and single machine scheduling with deteriorating jobs and a rate-modifying activity", Computers and Operations Research, 39(6), pp.1300~1303 (2012)