두단계 조립시스템에서의 일정계획문제에 관한 소고

A Note on the Scheduling Problem in the Two-stage Assembly-type Flowshop

2

조회

0

다운로드

0

인용

0

참고문헌

주제분류산업공학

초록

Abstract

This paper considers a scheduling problem concerned with an assembly system where two components are first treated in their own parallel machines and then pulled to be assembled into a final product at a single assembly machine. The objective measure is the mean completion time of jobs(a finite number of products). Through characterizing solution properties, we obtain the worst case error bounds of an arbitrary permutation and a SPT based heuristic.

참고문헌 (9)

  1. 윤상흠, "다중기계로 구성되는 조립전단계에서의 부품생산 일정계획"
  2. Baker, "Optimal Allocation of Work in Assembly Systems", pp.101~106 (1993)
  3. I, "CONWIP Assembly with Deterministic Processing and Random Outages", pp.97~109 (1992)
  4. Garey, "The Complexity of Flowshop and Jobshop Scheduling Mathematics of Operations Research", pp.117~129 (1976)
  5. Lee, "Minimizing the Makespan in the 3-Machine Assembly-type Flowshop Scheduling Problem", pp.616~625 (1993)
  6. Mascolo, "Modeling and Analysis of Assembly Systems with Unreliable Machines and Finite Buffers", pp.315~330 (1991)
  7. Potts, "The Two-stage Assembly Scheduling Problem: Complexity and Approximation", 43, pp.346~355 (1995)
  8. Sun, "Powerful Heuristics to Minimize Makespan in Fixed, 3-machine, Assembly-type Flowshop Scheduling"", 146, pp.499~517 (2003)
  9. Sung, "Minimizing Total Weighted Completion Time at a Pre-assembly Stage Composed of Two Feeding Machines", 54, pp.247~255 (1998)

관련 논문AI추천

이 간행물의 다른 논문 (14건)