본문 바로가기
KERD
논문KCI 등재

TFT-LCD 공장의 제조 기준정보 자동 산출 시스템 구축 사례

A Case Study of the Development of Standard Production Information System in TFT-LCD Factory

1

조회

0

다운로드

4

인용

0

참고문헌

주제분류산업공학

초록

Abstract

In this paper, we propose a systematic procedure to determine standard time and cycle time in a TFT-LCD factory. The proposed procedure mainly consists of data preprocessing, hypothesis testing and Group technology. Data preprocessing extracts relevant data from large on-line data sets by eliminating corrupt and noisy data. Hypothesis test techniques have been used to determine whether the standard information has been changed. Also, Group technology has been applied to generate standard information for newly developed products. The proposed procedure has been successfully applied to the production information system of a TFT-LCD factory in Korea.

참고문헌 (6)

  1. 백종관, "TFT-LCD 공장의 Array 공정에 대한 생산 계획 수립", pp.493~496 (2001)
  2. 나혁준, "TFT-LCD 공장의 생산계획 수립에 관한 연구", pp.958~961 (2001)
  3. 이영훈, "TFT-LCD 공정에서의 Push-Pull 생산모델", pp.496~501 (2002)
  4. 조한민, "TFT-LCD 생산라인에서의 작업량 결정에 관한 연구", 11(2), pp.23~39 (2000)
  5. R, "A Review of Production Planning and Scheduling Models in the Semiconductor Industry", pp.47~60 (1992)
  6. Famili,A, "Data Preprocessing and Intelligent Data Analysis", 1, pp.3~23 (1997)

관련 논문AI추천

이 간행물의 다른 논문 (19건)