아웃소싱 전략을 활용하는 두 단계 흐름생산라인의 일정계획
A Two-Machine Flowshop Scheduling with Outsourcing Strategy Allowed
1
조회
0
다운로드
1
인용
0
참고문헌
키워드
초록
This paper considers a scheduling problem in a two-machine flowshop with outsourcing strategy incorporated. The jobs can be either processed in the first machine or outsourced to outside subcontractors. This paper wants to determine which jobs to be processed in-house and which jobs to be outsourced. If any job is decided to be outsourced, then an additional outsourcing cost is charged The objective of this paper is to minimize the sum of scheduling cost and outsourcing cost under a budget constraint. At first this paper characterizes some solution properties, and then it derives solution procedure including DP (Dynamic Programming) and B&B (Branch-and-Bound) algorithms and a greedy-type heuristic. Finally the performance of the algorithms are evaluated with some numerical tests.
Abstract
This paper considers a scheduling problem in a two-machine flowshop with outsourcing strategy incorporated. The jobs can be either processed in the first machine or outsourced to outside subcontractors. This paper wants to determine which jobs to be processed in-house and which jobs to be outsourced. If any job is decided to be outsourced, then an additional outsourcing cost is charged The objective of this paper is to minimize the sum of scheduling cost and outsourcing cost under a budget constraint. At first this paper characterizes some solution properties, and then it derives solution procedure including DP (Dynamic Programming) and B&B (Branch-and-Bound) algorithms and a greedy-type heuristic. Finally the performance of the algorithms are evaluated with some numerical tests.
참고문헌 (22)
- 이익선, "아웃소싱을 고려한 병렬기계 일정계획 연구", 산업경영시스템학회지, 31(3), pp.101~109 (2008), 한국산업경영시스템학회
- Abdel-Malek, L., "A Framework for Comparing Outsourcing Strategies in Multi-layered Supply Chains", International Journal of Production Economics, 97, pp.318~328 (2005)
- Baker, K.R., "Introduction to Sequencing and Scheduling", pp.118~119 (1974), John Wiley and Sons, Inc
- Byung-Cheon, C., "Two-machine flow shop scheduling problem with an outsourcing option", European Journal of Operational Research, 213, pp.66~72 (2011)
- Cachon, G.P., "Competition and Outsourcing with Scale Economies", Management Science, 48, pp.1314~1333 (2002)
- Dae-Young, C., "Outsourcing and scheduling for two-machine ordered flow shop scheduling problems", European Journal of Operational Research, 226, pp.46~52 (2013)
- Dekkers, R., "Decision Models for Outsourcing and Core Competencies in Manufacturing", International Journal of Production Research, 38, pp.4085~4096 (2000)
- Huiskonen, J., "Lateral Coordination in a Logistics Outsourcing Relationship", International Journal of Production Economics, 78, pp.177~185 (2002)
- Kaipia, R., "Vendor Managed Category Management-an Outsourcing Solution in Retailing", Journal of Purchasing and Supply Management, 9, pp.165~175 (2003)
- Kangbok, L., "Two-stage production scheduling with an outsourcing option", European Journal of Operational Research, 213, pp.489~497 (2011)
- Kim, B., "Dynamic Outsourcing to Contract Manufacturers with Different Capabilities of Reducing the Supply Cost", International Journal of Production Economics, 86, pp.63~80 (2003)
- Kouvelis, P., "Supply Chain Capacity and Outsourcing Decisions : the Dynamic Interplay of Demand and Supply Uncertainty", IIE Transactions, 34, pp.717~728 (2002)
- Lee, I.S., "Single Machine Scheduling with Outsourcing Allowed", International Journal of Production Economics, 111, pp.623~634 (2008)
- Lee, I.S., "Minimizing Due Date Related Measures for a Single Machine Scheduling with Outsourcing Allowed", European Journal of Operational Research, 186, pp.931~952 (2008)
- Ngwenyama, O.K., "Making the Information Systems Outsourcing Decision : A Transaction Cost Approach to Analyzing Outsourcing Decision Problems", European Journal of Operational Research, 115, pp.351~367 (1999)
- Nicholson, L., "Outsourcing Inventory Management Decisions in Healthcare: Models and Application", European Journal of Operational Research, 154, pp.271~290 (2004)
- Offodile, O.F., "The Virtual Manufacturing Paradigm : The Impact of IT", IS Outsourcing on Manufacturing Strategy, 2002, pp.75, 147~159
- Xiangtong, Q., "Two-stage production scheduling with an option of outsourcing from a remote supplier", Journal of System Science and System Engineering, 18, pp.1~15 (2009)
- Tarakci, H., "Incentive Maintenance Outsourcing Contracts for Channel Coordination and Improvement", IIE Transactions, 38, pp.671~684 (2006)
- Tarakci, H., "Maintenance Outsourcing of a Multi-process Manufacturing System with Multiple Contractors", IIE Transactions, 38, pp.67~78 (2006)
- Wu, F., "An Outsourcing Decision Model for Sustaining Long-term Performance", International Journal of Production Research, 43, pp.2513~2535 (2005)
- Yang, J., "A Production-inventory System with Markovian Capacity and Outsourcing Option", Operations Research, 53, pp.328~349 (2005)
