초록

This paper deals with rescheduling on unrelated parallel-machines with compressible processing times, assuming that the arrival of a set of new jobs triggers rescheduling. It formulates this rescheduling problem as an assignment problem with a side constraint and proposes a heuristic to solve it. Computational tests evaluate the efficacy of the heuristic.

Abstract

This paper deals with rescheduling on unrelated parallel-machines with compressible processing times, assuming that the arrival of a set of new jobs triggers rescheduling. It formulates this rescheduling problem as an assignment problem with a side constraint and proposes a heuristic to solve it. Computational tests evaluate the efficacy of the heuristic.

참고문헌 (22)

  1. Aboudi, R., "Resource constrained assignment problems", Discrete Appl Math, 26, pp.175~191 (1990)
  2. Aggarwal, V., "A lagrangean-relaxation method for the constrained assignment problem", Compu Oper Res, 12(1), pp.97~106 (1985)
  3. Akturk, M. S., "Parallel machine match-up scheduling with manufacturing cost considerations", J Sched, 13, pp.95~110 (2010)
  4. Alagoz, O., "Rescheduling of identical parallel machines under machine eligibility constraints", Eur J Oper Res, 149, pp.523~532 (2003)
  5. Alidaee, B., "Two parallel machine sequencing problems involving controllable job processing times", Eur J Oper Res, 70, pp.335~341 (1993)
  6. Azizoglu, M., "Parallel-machine rescheduling with machine disruptions", IIE Trans, 37, pp.1113~1118 (2005)
  7. Cheng, T. C. E., "Parallel-machine scheduling with controllable processing times", IIE Trans, 28, pp.177~180 (1996)
  8. Curry, J., "Rescheduling parallel machines with stepwise increasing tardiness and machine assignment stability objectives", Inter J Prod Res, 43(15), pp.3231~3246 (2005)
  9. Gupta, A., "Tree search method for optimal core management of pressurized water reactors", Compu Oper Res, 8(4), pp.263~266 (1981)
  10. Gurel, S., "Rescheduling with controllable processing times for number of disrupted jobs and manufacturing cost objectives", Int J Prod Res, 53(9), pp.2751~2770 (2015)
  11. Gurel, S., "Considering manufacturing cost and scheduling performance on a CNC turning machine", Eur J Oper Res, 177, pp.325~343 (2007)
  12. Lieshout, P.M.D., "A branch-andbound algorithm for the singly constrained assignment problem", Eur J Oper Res, 176, pp.151~161 (2007)
  13. Mazzola, J., "Resource-constrained assignment scheduling", Oper Res, 34, pp.560~572 (1986)
  14. Murty, K., "An algorithm for ranking all the assignments in order of increasing cost", Oper Res, 16, pp.682~687 (1968)
  15. Ozlen, M., "Generating all efficient solutions of a rescheduling problem on unrelated parallel machines", Int J Prod Res, 47(19), pp.5245~5270 (2009)
  16. Papadimitriou, C.H., "Combination Optimization : Algorithms and Complexity" (1982), Prentice Hall
  17. Pinedo, M. L, "Scheduling : Theory, Algorithm, and Systems" (2008), Prentice Hall
  18. Punnen, A., "A tabu search algorithm for the resource-constrained assignment problem", J Oper Res Soc, 46, pp.214~220 (1995)
  19. Shabtay, D., "A survey of scheduling with controllable processing times", Discrete Appl Math, 155, pp.1643~1666 (2007)
  20. Vickson, R. G., "Two single-machine sequencing problems involving controllable job processing times", AIIE Trans, 12, pp.258~262 (1980)
  21. Yang, B., "Single machine rescheduling with new jobs arrivals and processing time compression", Inter J Adv Manuf Tech, 34, pp.378~384 (2007)
  22. Yin, N., "Single-machine scheduling with controllable processing times and learning effect", Int J Adv Manuf Technol, 54, pp.743~748 (2011)

관련 논문AI추천

이 간행물의 다른 논문 (16건)