폐수종말처리장으로 유입되는 특정수질유해물질에 대한 개별 업체의 적정 배출허용기준 설정
Determination of Effluent Limitations for Priority Water Pollutants from Industrial Facilities to Terminal Disposal Plants for Wastewater
0
조회
0
다운로드
1
인용
0
참고문헌
키워드
초록
In this study, a practical method to establish effluent limitations for priority water pollutants (PWPs) from industrial facilities was developed. As a case study, we collected influent and effluent wastewater samples from a terminal disposal plant for wastewater in Ulsan, Korea. Five water quality parameters and 17 PWPs were analyzed, and their discharge loads to the terminal disposal plant were calculated. In addition, the treatment efficiencies of PWPs were estimated by measuring concentrations and flow rates using the direct calculation method and the Monte Carlo simulation. If treatment efficiencies of PWPs are higher than 20%, the effluent limitations for industrial facilities can be maintained or relaxed in comparison with the Ministry of Environment (MOE) limitations for terminal disposal plants. Furthermore, a range of effluent limitations for the industrial facilities with various operating conditions of the terminal disposal plant (0-100%) were suggested. The method for establishing PWP limitations developed in this study can be applied to any terminal disposal plants.
Abstract
In this study, a practical method to establish effluent limitations for priority water pollutants (PWPs) from industrial facilities was developed. As a case study, we collected influent and effluent wastewater samples from a terminal disposal plant for wastewater in Ulsan, Korea. Five water quality parameters and 17 PWPs were analyzed, and their discharge loads to the terminal disposal plant were calculated. In addition, the treatment efficiencies of PWPs were estimated by measuring concentrations and flow rates using the direct calculation method and the Monte Carlo simulation. If treatment efficiencies of PWPs are higher than 20%, the effluent limitations for industrial facilities can be maintained or relaxed in comparison with the Ministry of Environment (MOE) limitations for terminal disposal plants. Furthermore, a range of effluent limitations for the industrial facilities with various operating conditions of the terminal disposal plant (0-100%) were suggested. The method for establishing PWP limitations developed in this study can be applied to any terminal disposal plants.
참고문헌 (19)
- 환경부, "수질 및 수생태계 보전에 관한 법률", 법률 제12519호, ~ (2015)
- 환경부, "수질 및 수생태계 보전에 관한 법률", 환경부령 제600호, 별표 3, ~ (2013)
- 정동환, "산업계 배출수에서 포름알데히드의 배출허용기준 설정방안 고찰", 환경영향평가, 22(3), pp.203~217 (2013), 한국환경영향평가학회
- 환경부, "수질오염물질의 배출허용기준", 제34조 별표13, ~ (2012)
- 환경부, "수질오염물질 배출허용기준 중 별도배출허용기준 지정·고시", 환경부 고시 제2012-10호, ~ (2012)
- K. Y. Fung., "Design of industrial wastewater treatment plants : a multi-faceted problem", Current Opinion in Chemical Engineering, 2, pp.455~460 (2013)
- E. Llorens., "Evaluation of WWTP discharges into a Mediterranean river using KSOM neural networks and mass balance modelling", Chemical Engineering Journal, 142, pp.135~146 (2008)
- 이형재, "공장폐수내 난분해성 유기물이 하수처리장 운영관리에 미치는 영향 연구", 석사, 환경관리학, pp.2008
- 환경부, "폐수종말처리시설 설치 및 운영관리지침 개정", ~ (2013)
- 환경부, "수질오염공정시험기준", ~ (2014)
- S. -K. Kim., "Wastewater treatment plants(WWTPs)-derived national discharge loads of perfluorinated compounds(PFCs)", Journal of Hazardous Materials, 201(202), pp.82~91 (2012)
- N. Ozaki., "Loading and removal of PAHs in a wastewater treatment plant in a separated sewer system", Water Research, 80, pp.337~345 (2015)
- 호소의 수계내 완충기능에 대한 사례연구, "원주지방환경청", ~ (2011)
- "Crystal ball" (2015)[URL]
- 울산지역 유해대기오염물질(HAPs) 조사 연구, "국립환경과학원", ~ (2010)
- 황수림, "온실가스 배출계수 불확도 평가 연구 : 시멘트산업을 중심으로", 석사, 지구환경과학, pp.2010
- 김성욱, "입상 활성탄을 이용한 디클로로메탄의 흡착 제거 연구", 석사, 환경공학, pp.2010
- "국제암연구소" (2015)[URL]
- 서유덕, "1,4-다이옥산 함유폐수의 처리공정 개발", 경관리학회지, 15, pp.91~97 (2009)
