PROPOSE MODIFIED CONTROL CHART FOR MANAGEMENT IN REAL FIELD
PROPOSE MODIFIED CONTROL CHART FOR MANAGEMENT IN REAL FIELD
이상복, 박노국
초록
In this paper, we gave 3 suitable modified control chart at the same time shows. First control chart is plot analysis control chart by sampling data, Second control chart is including Upper Spec and Lower Spec in first control chart. Third control chart is including target value and new calculated upper/lower control line by using known average and standard deviation of long term data. If 3 control charts are seen at the same time, there is advantage that can see problem of process at a look. We hope this method proposed in this treatise give many help in spot.